 | United States. Congress. Senate. Committee on Appropriations - Public works - 1967
...benefits, all flood control, are estimated *t żgr.soo, Ioa-Federvzi ooat.—.Local Interests are to: (a) Provide without cost to the United States, all...rights-of-way necessary for the construction of the project ; provide necessary relocations and alterations to highways, roads, and bridges ; relocate... | |
 | United States. Congress. House. Appropriations - Public works - 1967
...shall be expended on the construction of any item of the project until the States or levee districts have given assurances satisfactory to the Secretary of War that they will (a) maintain all flood control works after their completion, except controlling and regulating spillway... | |
 | Economic assistance, Domestic - 1973
...communities for funds expended in repair or rehabilitation efforts. Local interests are normally required to (a) provide without cost to the United States all...lands, easements, and rights-of-way necessary for the authorized work; (b) hold and save the United States free from damages due to the authorized work;... | |
 | Water Resources Council (U.S.) - Flood control - 1971
...as provided in section 701c, chapter 15, title 33 of the United States Code Annotated that the state will (a) provide without cost to the United States...and rights-of-way necessary for the construction of any flood control project and pay for the cost of acquisition of earthen material required for the... | |
 | United States. Congress. House. Public Works Committee - 1973 - 1443 pages
...prior to construction, local interests furnish assurances satisfactory to the Secretary of the Army that they will : a. Provide, without cost to the United...easements, and rightsof-way necessary for the construction and oi>eration of the project, including those required for increasing the grade of existing levees... | |
 | United States. Army. Corps of Engineers - Channels (Hydraulic engineering) - 1976 - 246 pages
...aids: Provided that, prior to the commencement of construction, non-Federal interests will agree to: a. Provide without cost to the United States all lands,...easements, and rights-of-way necessary for the construction and subsequent maintenance and for aids to navigation upon request of the Chief of Engineers, including... | |
| |