Search Images Maps Play YouTube News Gmail Drive More »
Sign in
Books Books
" California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of... "
Flood Control Bill of 1946: Hearings Before the Committee on Flood Control ... - Page 26
by United States. Congress. House. Committee on Flood Control - 1946 - 700 pages
Full view - About this book

Flood Control Plans and New Projects: 1943 and 1944 Hearings Before the ...

United States. Congress. House. Committee on Flood Control - Flood control - 1944
...engineer and my comments herein, and with modifications thereof as in the discretion of (he Secretary of War and the Chief of Engineers may be advisable, at an estimated first cost of $1,561,000 and $7,000 annually for maintenance and operation. (b) Enlargement of Hogan...
Full view - About this book

Report of the Chief of Engineers U.S. Army, Volume 2, Part 1

United States. Army. Corps of Engineers - Engineering - 1950
...with the plan of the district engineer and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable, at an estimated cost of $329,900 for new work and $4,000 annually for additional maintenance, subject to the requirement that...
Full view - About this book

Additional Appropriation for Veterans' Housing and Related Expenses ...

United States. Congress. Senate. Committee on Appropriations - Housing - 1946 - 11 pages
...accordance with the plans contained in House Document Numbered 630, Seventy-sixth C<* gress, third session, with such modifications thereof as In the discretion...Engineers may be advisable at an estimated cost of $19,700,000: Provided, That the conditions of local cooperation specified in said document shall not...
Full view - About this book

Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2

United States. Army. Corps of Engineers - Harbors - 1948
...a harbor basin 8 feet deep, 800 feet long, and from 100 to 350 feet wide ; with such modifications as in the discretion of the Secretary of War and the Chief of Engineers may be desirable. The project depth is referred to low-water datum for Lake Erie, elevation 570.5 feet above...
Full view - About this book

Rivers and Harbors Bill: Hearings, Seventy-ninth Congress

United States. Congress. House. Committee on Rivers and Harbors - Harbors - 1946 - 310 pages
...Columbia and the Santee Reservoir, generally in accordance with the plans of the division engineer, with such modifications thereof as in the discretion...Engineers may be advisable at an estimated cost of $51,511,000 for construction and $317,000 annually for operation and maintenance. The improvement was...
Full view - About this book

Big Sandy River and Tug and Levisa Forks, Ky., W. Va., and Va. Hearings ...

United States. Congress. House. Committee on Rivers and Harbors - 1946 - 402 pages
...with the plans of the district engineer as shown on the accompanying drawings and the above comments and with such modifications thereof as in the discretion...of Engineers may be advisable, at an estimated cost to the United States of $82,300,000 for new work and $600,000 annually for maintenance and operation...
Full view - About this book

Big Sandy River and Tug and Levisa Forks, Ky., W. Va., and Va: Hearings ...

United States. Congress. House. Committee on Rivers and Harbors - Big Sandy River (Ky. and W. Va.) - 1946 - 402 pages
...with the plans of the district engineer as shown on the accompanying drawings and the above comments and with such modifications thereof as in the discretion...of Engineers may be advisable, at an estimated cost to the United States of $82,300,000 for new work and $600,000 annually for maintenance and operation...
Full view - About this book

Waterway Connecting the Tombigbee and Tennessee Rivers, Ala. and Miss ...

United States. Congress. House. Committee on Rivers and Harbors - 1946 - 284 pages
...in connection therewith, substantially in accordance with the general plan presented in this report, and with such modifications thereof as in the discretion...Chief of Engineers may be advisable at an estimated first cost to the United States of $116,941,000 for construction and an estimated annual cost of $811,000...
Full view - About this book

Waterway Connecting the Tombigbee and Tennessee Rivers, Ala. and Miss ...

United States. Congress. House. Committee on Rivers and Harbors - Inland navigation - 1946 - 284 pages
...in connection therewith, substantially in accordance with the general plan presented in this report, and with such modifications thereof as in the discretion...Chief of Engineers may be advisable at an estimated first cost to the United States of $116,941,000 for construction and an estimated annual cost of $811,000...
Full view - About this book

Hearings

United States. Congress. House. Committee on Flood Control - 1946
...Ohio River Basin, as contained in the Flood Control Committee Document No. 1, Seventy-fifth Congress, with such modifications thereof as in the discretion...of War and the Chief of Engineers may be advisable. The report of this committee on the Flood Control Act of 1938 — House Report No. 2353 of the Seventy-fifth...
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search
  4. Download EPUB
  5. Download PDF