... supply pipe left intermediate per only Flootwells € Highway bridge -Sta . 30 + 00.00 34 Gallery gutter --8-0718 ' - 0 " Gallery -Grouted contraction joint 8 Floatwell filling pipe . Manual control filling valve 19-6 · 0 ° 17'6 " High ...
... supply pipe left intermediate per only Flootwells € Highway bridge -Sta . 30 + 00.00 34 Gallery gutter --8-0718 ' - 0 " Gallery -Grouted contraction joint 8 Floatwell filling pipe . Manual control filling valve 19-6 · 0 ° 17'6 " High ...
Page 52
... supply tank , 4 - way valve ( one for each gate ) , and piping . The oil piping is con- nected to the hydraulic gate hanger of the regulating gate in such a manner that the hanger releases the gate before oil is passed into the hoist ...
... supply tank , 4 - way valve ( one for each gate ) , and piping . The oil piping is con- nected to the hydraulic gate hanger of the regulating gate in such a manner that the hanger releases the gate before oil is passed into the hoist ...
Page 53
... SUPPLY STENOGRAPHIC MAINTENANCE MATERIALS ENGINEER LABORATORY ENGINEER CONCRETE ENGINEER EARTHWORK ENGINEER Figure 24 .-- Government organization chart for Trenton Dam . ( a ) Laboratory . -- A laboratory was provided and staffed with ...
... SUPPLY STENOGRAPHIC MAINTENANCE MATERIALS ENGINEER LABORATORY ENGINEER CONCRETE ENGINEER EARTHWORK ENGINEER Figure 24 .-- Government organization chart for Trenton Dam . ( a ) Laboratory . -- A laboratory was provided and staffed with ...
Page 56
... Supply Contracts . The following is a listing of the principal supply contracts : Feature Spec . No. Supplier Contract price Riprap DS - 3259 rock and crushed rock blanket Cass Co. , Ogallala , Nebr . $ 1,609,000 Radial gates for ...
... Supply Contracts . The following is a listing of the principal supply contracts : Feature Spec . No. Supplier Contract price Riprap DS - 3259 rock and crushed rock blanket Cass Co. , Ogallala , Nebr . $ 1,609,000 Radial gates for ...
Page 57
... supply , and a sewer system , were constructed under specifications No. VII - 111 . Bids received in response to advertising for these specifications were opened March 16 , 1950 , at Trenton , Nebr . Four bids were received . The low ...
... supply , and a sewer system , were constructed under specifications No. VII - 111 . Bids received in response to advertising for these specifications were opened March 16 , 1950 , at Trenton , Nebr . Four bids were received . The low ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost