Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 6-10 of 20
Page 36
... square key , STEEL C9 Ight fit in shatt DETAILE Blockout for base E Drive SECTIONAL PLAN A - A Hoist platform To counter weight- & Drum . RIGHT HAND DRUM AND GEAR UNIT -Blockout for base 7 ' - 3 ' Float cables . ₤ Drum 2-11 ° 8-6 ° 1-10 ...
... square key , STEEL C9 Ight fit in shatt DETAILE Blockout for base E Drive SECTIONAL PLAN A - A Hoist platform To counter weight- & Drum . RIGHT HAND DRUM AND GEAR UNIT -Blockout for base 7 ' - 3 ' Float cables . ₤ Drum 2-11 ° 8-6 ° 1-10 ...
Page 37
... square inch . Each compressor has sufficient capacity to operate the system , but the two compressors are provided to assure continuity of operation . The air compressors are located in the compressor house on top of the spillway ...
... square inch . Each compressor has sufficient capacity to operate the system , but the two compressors are provided to assure continuity of operation . The air compressors are located in the compressor house on top of the spillway ...
Page 39
... square inch . In this design a bearing pressure of 1,100 pounds per square inch was used . The composition of cast bronze , class C , is as follows : Copper Tin Lead Zinc Percent 82.00 to 83.00 6.75 to 7.50 4.50 to 5.00 5.00 to 6.00 The ...
... square inch . In this design a bearing pressure of 1,100 pounds per square inch was used . The composition of cast bronze , class C , is as follows : Copper Tin Lead Zinc Percent 82.00 to 83.00 6.75 to 7.50 4.50 to 5.00 5.00 to 6.00 The ...
Page 42
... Square flue lining Bangles 45 PLAN STILLING WELL AND CONTROL HOUSE 12 " Embankment Dio x2 Phillips recess rd hd brass stove bolt Cement grout or comparable Sta 22 + 50.00 on Main cut - off trench , excavated under previous contract ...
... Square flue lining Bangles 45 PLAN STILLING WELL AND CONTROL HOUSE 12 " Embankment Dio x2 Phillips recess rd hd brass stove bolt Cement grout or comparable Sta 22 + 50.00 on Main cut - off trench , excavated under previous contract ...
Page 43
... Square flue lining 91 --Control house floor EL 2708.17 O EI . 2700.00- E2709.00 -Contraction joint Limits of special compaction Dumped prap --Rolled embankment 42 ′ - 3- El 2666 753-3 " Av 13-0 ° Min Bottom of excavation of accessory ...
... Square flue lining 91 --Control house floor EL 2708.17 O EI . 2700.00- E2709.00 -Contraction joint Limits of special compaction Dumped prap --Rolled embankment 42 ′ - 3- El 2666 753-3 " Av 13-0 ° Min Bottom of excavation of accessory ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost