Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 6-10 of 29
Page 21
... Specifications 2689 Figure 8 . 50- -El 2710 -21 10 : 1 Assumed shale surface ELEVATION 2800 duit 2780 O 2 4 AREA - THOUSANDS OF ACRES 6 8 CAPACITY O 100 200 300 10 THOUSANDS OF ACRE FEET 400 Max WS . El 2785.0 361,620 A F 2760 -Spillway ...
... Specifications 2689 Figure 8 . 50- -El 2710 -21 10 : 1 Assumed shale surface ELEVATION 2800 duit 2780 O 2 4 AREA - THOUSANDS OF ACRES 6 8 CAPACITY O 100 200 300 10 THOUSANDS OF ACRE FEET 400 Max WS . El 2785.0 361,620 A F 2760 -Spillway ...
Page 22
... specifications provided for placement of zone 3 material which consisted of selected material from dam foundation and structure excavations . The locations of the various zones are shown on figure 8 . The embankment design was initially ...
... specifications provided for placement of zone 3 material which consisted of selected material from dam foundation and structure excavations . The locations of the various zones are shown on figure 8 . The embankment design was initially ...
Page 37
... Specifications for Highway Bridges , " fifth edition , for an H20 - S16-44 loading . The allowable stresses used in the design are given in appen- dix F. Retaining wall- -Contraction joint -15 " Approach channel lining -Sta 337 Ice ...
... Specifications for Highway Bridges , " fifth edition , for an H20 - S16-44 loading . The allowable stresses used in the design are given in appen- dix F. Retaining wall- -Contraction joint -15 " Approach channel lining -Sta 337 Ice ...
Page 39
... Specifications QQ - B - 691b , composition 6. The use of metals of different composition in the two seats permits satisfactory gate operation with bearing pressures up to 3,000 pounds per square inch . In this design a bearing pressure ...
... Specifications QQ - B - 691b , composition 6. The use of metals of different composition in the two seats permits satisfactory gate operation with bearing pressures up to 3,000 pounds per square inch . In this design a bearing pressure ...
Page 40
... specifications 1 See Spec's 6 Gate sill Cast iron - class 30 & babbitt 1 40 - D - 2337 7 Horizontal leaf seat Class " C " bronze 1 8 Vertical leaf seat Class " C " bronze 2 9 Bonnet seat Class " D " bronze 2 • + Provide 8 parts No. 19 ...
... specifications 1 See Spec's 6 Gate sill Cast iron - class 30 & babbitt 1 40 - D - 2337 7 Horizontal leaf seat Class " C " bronze 1 8 Vertical leaf seat Class " C " bronze 2 9 Bonnet seat Class " D " bronze 2 • + Provide 8 parts No. 19 ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost