Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 11-15 of 24
Page 39
... hoist for holding the gate at any required opening . With the gates 100 percent open , the river outlets have a ... hoist having a capacity of 173,000 pounds with the oil pressure in the hoist cylinder at 750 pounds per square inch . The ...
... hoist for holding the gate at any required opening . With the gates 100 percent open , the river outlets have a ... hoist having a capacity of 173,000 pounds with the oil pressure in the hoist cylinder at 750 pounds per square inch . The ...
Page 40
... HOIST - LIST OF PARTS . LEAF - RECESS COVER - BOLTS 40-0-2338 OR 40-0-4979 -BONNET BONNET COVER HOIST CYLINDER - PISTON - STEM PACKING GLANDS - BOLTS - LIST OF PARTS . CONDUIT CONDUIT LINING CONDUIT LINING TRANSITION . * See list of ...
... HOIST - LIST OF PARTS . LEAF - RECESS COVER - BOLTS 40-0-2338 OR 40-0-4979 -BONNET BONNET COVER HOIST CYLINDER - PISTON - STEM PACKING GLANDS - BOLTS - LIST OF PARTS . CONDUIT CONDUIT LINING CONDUIT LINING TRANSITION . * See list of ...
Page 41
... hoists . Water released through the outlet works flows through the regulating gate into a side - entry stilling well which discharges into the canal . The stilling well is a vertical shaft of octagonal shape with a discharge lip at ...
... hoists . Water released through the outlet works flows through the regulating gate into a side - entry stilling well which discharges into the canal . The stilling well is a vertical shaft of octagonal shape with a discharge lip at ...
Page 46
... hoist -4 " Floor drain B -Ventilating pipe Pipe handrail-- £ Gate chamber Sta 4 + 80.00 L 8-2 Dia H.S. conduit Sta 4 + 90.00 ---- SECTION A - A EI 2679.67 ・ 5 : 0 -EI . 2690.10 Ventilation system exhaust head Pipe handrail- 18 " Steel ...
... hoist -4 " Floor drain B -Ventilating pipe Pipe handrail-- £ Gate chamber Sta 4 + 80.00 L 8-2 Dia H.S. conduit Sta 4 + 90.00 ---- SECTION A - A EI 2679.67 ・ 5 : 0 -EI . 2690.10 Ventilation system exhaust head Pipe handrail- 18 " Steel ...
Page 50
... hoist.- Floor drain Ventilating pipe - A B --Ventilating pipe 4 " Gutter- 18 " Steel ladder- 8-2 " Dia . horseshoe conduit -Pipe handrail Gate chamber Sta . 22 + 50.00 · PLAN EMERGENCY GATE CHAMBER Semi - automatic gate hanger-- El ...
... hoist.- Floor drain Ventilating pipe - A B --Ventilating pipe 4 " Gutter- 18 " Steel ladder- 8-2 " Dia . horseshoe conduit -Pipe handrail Gate chamber Sta . 22 + 50.00 · PLAN EMERGENCY GATE CHAMBER Semi - automatic gate hanger-- El ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost