... gate chamber located near the axis of the dam . A horse- shoe conduit , about 244 feet long and containing a 56 - inch steel outlet pipe , extends from the emergency gate chamber to a control house and stilling well structure . An ...
... gate chamber located near the axis of the dam . A horse- shoe conduit , about 244 feet long and containing a 56 - inch steel outlet pipe , extends from the emergency gate chamber to a control house and stilling well structure . An ...
Page 29
... gates- -21-021-0 . Control well intake E 2728.00 Slope 3 : 1 42 ' - 0 " . E12754.00 Top of crest EL 2743.00 : F El 2733.00 -42-0 -River outlet . gate chamber- 8-0'x8'0 Gallery Gravel blanket -El 2705.0 Sta 86 +69.65 15 " Av . 12 Min El ...
... gates- -21-021-0 . Control well intake E 2728.00 Slope 3 : 1 42 ' - 0 " . E12754.00 Top of crest EL 2743.00 : F El 2733.00 -42-0 -River outlet . gate chamber- 8-0'x8'0 Gallery Gravel blanket -El 2705.0 Sta 86 +69.65 15 " Av . 12 Min El ...
Page 37
... gates to rise to a full open position . Each float is a steel tank containing an air chamber , sand , and asphalt to make its weight about 10 percent more than the weight of the displaced water when completely submerged . The buoyant ...
... gates to rise to a full open position . Each float is a steel tank containing an air chamber , sand , and asphalt to make its weight about 10 percent more than the weight of the displaced water when completely submerged . The buoyant ...
Page 38
... gate chamber River outlet gate chamber . -4 " x4 " Gutter Sta . 30 + 12.00 EL 2733.00 -8 ' - 08-0 ° Gallery --- Gallery gutter 6-017-6 High pressure gates-- E8-08-0 " Gallery Pipe handrail Pier-- -Counterweight Grouted contraction joint ...
... gate chamber River outlet gate chamber . -4 " x4 " Gutter Sta . 30 + 12.00 EL 2733.00 -8 ' - 08-0 ° Gallery --- Gallery gutter 6-017-6 High pressure gates-- E8-08-0 " Gallery Pipe handrail Pier-- -Counterweight Grouted contraction joint ...
Page 41
... gate chamber , station 4 + 68 , and was constructed in sections each of which is provided with a cutoff collar . The gate chamber houses a 4- by 4 - foot high - pressure , hydraulically operated emergency slide gate . An 8 - foot 2 ...
... gate chamber , station 4 + 68 , and was constructed in sections each of which is provided with a cutoff collar . The gate chamber houses a 4- by 4 - foot high - pressure , hydraulically operated emergency slide gate . An 8 - foot 2 ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost