Port and Terminal Facilities at the Ports of the Territory of Hawaii, 1941 |
From inside the book
Results 6-7 of 7
Page 31
... entrance to the harbor is due west from Ninini Point Light between the end of the break- water and north shore , thence to the southwest on the inside of the breakwater . It is well marked by buoys . The project for improving the harbor ...
... entrance to the harbor is due west from Ninini Point Light between the end of the break- water and north shore , thence to the southwest on the inside of the breakwater . It is well marked by buoys . The project for improving the harbor ...
Page 39
... entrance channel 500 feet wide of the same depth . The project has been completed and the controlling depth on September 30 , 1940 , was 35 feet except for small areas along the project lines . The plane of reference is mean lower low ...
... entrance channel 500 feet wide of the same depth . The project has been completed and the controlling depth on September 30 , 1940 , was 35 feet except for small areas along the project lines . The plane of reference is mean lower low ...
Other editions - View all
Common terms and phrases
35 feet 50 cents 8-inch fuel oil Allowable floor load available to ves available to vessels Berthing space available Capacity per square City main city service concrete deck concrete piles Consolidated Ry corrugated iron deck on concrete Depth of water Diesel oil Electric current available Eleele Face or end Feet Feet Feet Fire protection fuel oil line HARBOR FACILITIES Inter-Island Steam Navigation Iwilei Kahului Kapalama Kauai Terminal Lighted or unlighted lines using terminal Location on water Lower side Upper Matson Line Mechanical handling facilities Number of floors number on map Open wharf phase pipe line Port Allen PORT AND HARBOR PORT OF HONOLULU pounds Reference number Reinforced concrete sheds on pier side Upper side Sprinkler system square foot Standard Oil Co terminal regularly Territory of Hawaii Total floor area tracks on apron Trans-Pacific freight Type of construction U. S. Army Upper side Face volts water front Water supply available Width of apron
Popular passages
Page 41 - Mechanical handling facilities.. Railway connections. Steamship lines using terminal regularly. Water supply available to vessels. Fire protection other than city service. Electric current available to vessels. Remarks 1 Pier No.
Page 41 - Reference number on map Name Location on water front. Owned by Operated by Purpose for which used.. Type of construction Description: Dimensions.. Depth of water, m. 1.
Page 35 - Mechanical handling facilities Railway connections Steamship lines using terminal regularly. Water supply available to vessels. . Fire protection other than city service. Electric current available to vessels: Lighting Power Remarks.