Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 6-10 of 27
Page 3
... BASIN PROJECT Wichita LOCATION MAP SUBMITTED .. KBIJENU . RECOMMENDED Malder . KN . Mollellan APPROVED : .... CHIEF ENGINEER DENVER , COLORADO , MAY 3 , 1949 328 - D - 802 Figure 2 .-- Trenton Dam location map . 4 ELEVATIONS 2760 Loess ...
... BASIN PROJECT Wichita LOCATION MAP SUBMITTED .. KBIJENU . RECOMMENDED Malder . KN . Mollellan APPROVED : .... CHIEF ENGINEER DENVER , COLORADO , MAY 3 , 1949 328 - D - 802 Figure 2 .-- Trenton Dam location map . 4 ELEVATIONS 2760 Loess ...
Page 4
... BASIN PROJ FRENCHMAN - CAMBRIDGE DIVISION - M TRENTON DAM GEOLOGICAL SECTION DAM FOUNDATION DRAWN ... SUBMITTED TRACED RECOMMENDEDftige CHECKED APPROVEDE TRENTON , NIBH . SEPT . 1956 328-720-44 & US Highway No 34 Relocation GOWA ...
... BASIN PROJ FRENCHMAN - CAMBRIDGE DIVISION - M TRENTON DAM GEOLOGICAL SECTION DAM FOUNDATION DRAWN ... SUBMITTED TRACED RECOMMENDEDftige CHECKED APPROVEDE TRENTON , NIBH . SEPT . 1956 328-720-44 & US Highway No 34 Relocation GOWA ...
Page 7
... basins and ditches in the abutment . 7 . Construction Materials . - It was estimated that the following quantities would be needed for construction of the dam and appurtenant structures : ( 1 ) Impervious material , cu . yd . ( 2 ) ...
... basins and ditches in the abutment . 7 . Construction Materials . - It was estimated that the following quantities would be needed for construction of the dam and appurtenant structures : ( 1 ) Impervious material , cu . yd . ( 2 ) ...
Page 10
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBR . TRENTON DAM CHECHED SUBMITTED . RECOMMENDED . APPROVED . DRAWN SCALE OF FEET TRAGED . Figure 5 .-- Plan of borrow areas and logs of several test holes . Right of way boundary Hay ...
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBR . TRENTON DAM CHECHED SUBMITTED . RECOMMENDED . APPROVED . DRAWN SCALE OF FEET TRAGED . Figure 5 .-- Plan of borrow areas and logs of several test holes . Right of way boundary Hay ...
Page 13
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBRASKA SWANSON RESERVOIR AREA RAILROAD AND HIGHWAY RELOCATION DRAWN ... Al SUBMITTED . 7.3.1.3.nu. TRAGED ... P.FR ........ RECOMMENDED OF Rice . CHECKED ML FOR APPROVED ... hil DENVER ...
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBRASKA SWANSON RESERVOIR AREA RAILROAD AND HIGHWAY RELOCATION DRAWN ... Al SUBMITTED . 7.3.1.3.nu. TRAGED ... P.FR ........ RECOMMENDED OF Rice . CHECKED ML FOR APPROVED ... hil DENVER ...
Other editions - View all
Common terms and phrases
abutment acre-feet aggregate backfill Berm blanket blockouts Brass Cap BUREAU OF RECLAMATION camber canal outlet cement centerline chute coarse concrete construction Contraction joint contractor control house crushed rock cubic yards cutoff trench dam embankment dam foundation designed discharge eleva emergency gate chamber Figure Float flood control gravel grout high-pressure gates Highway bridge Hitchcock County holes horizontal hydraulic hydrostatic head inlet intake structure layer Limits of special loads located loess material maximum metal Nebr north borrow operation pier Pierre shale piezometer Pipe handrail pounds per square pozzolan PROJ pump radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet Settlement point Shale surface SILT silty slope south borrow area special compaction specifications spillway structure steel stilling basin storage Sump Sump pump surface at elevation tests Trenton Dam upstream valve vertical walls water surface elevation
Popular passages
Page 51 - Design, Construction, Inspection and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases.
Page 99 - yd. cu. yd. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 94 - yd. cu. yd. cu. yd. cu. yd. Labor and materials by contractor Unit cost
Page 96 - ft. lin. ft. lin. ft. lin. ft. Labor and materials by contractor Unit cost
Page 100 - cu. yd. Lump sum Lump sum Labor and materials by contractor Unit cost 2.00
Page 99 - 88 89 90 91 92 93 94 Property and pay item description Installing metal pipe, fittings, and valves less than 6 inches in diameter Installing metal pipe, fittings, and valves 6 inches
Page 25 - above the maximum water surface, to prevent the dam from being overtopped by waves. Factors influencing wave height and wave ride-up, including maximum wind velocity, direction and duration, offshore reservoir
Page 98 - ft. Ib. Ib. Ib. Ib. Ib. Ib. Ib. Labor and materials by contractor Unit cost