Trenton Dam: Constructed 1949-1953 |
From inside the book
Results 6-10 of 26
Page 3
... BASIN PROJECT 25 FRENCHMAN - CAMBRIDGE DIVISION NEBRASKA TRENTON DAM Wichita DRAWN ... R.B.R TRACED EMA . CHECKED CLOCW . LOCATION MAP SUBMITTED .. квити Withalder RECOMMENDED .. APPROVED : Mathellan CHIEF ENGINEER DENVER , COLORADO ...
... BASIN PROJECT 25 FRENCHMAN - CAMBRIDGE DIVISION NEBRASKA TRENTON DAM Wichita DRAWN ... R.B.R TRACED EMA . CHECKED CLOCW . LOCATION MAP SUBMITTED .. квити Withalder RECOMMENDED .. APPROVED : Mathellan CHIEF ENGINEER DENVER , COLORADO ...
Page 4
... BASIN PROJ FRENCHMAN - CAMBRIDGE DIVISION - M TRENTON DAM GEOLOGICAL SECTION DAM FOUNDATION DRAWN 458 SUBMITTED un lley TRACED A RECOMMENDEDI CHECKES APPROVEDE TRENTON , NIER JPY17956 328-720-446 E ON ADMUBINT SIT 3 2793 RR Relocation ...
... BASIN PROJ FRENCHMAN - CAMBRIDGE DIVISION - M TRENTON DAM GEOLOGICAL SECTION DAM FOUNDATION DRAWN 458 SUBMITTED un lley TRACED A RECOMMENDEDI CHECKES APPROVEDE TRENTON , NIER JPY17956 328-720-446 E ON ADMUBINT SIT 3 2793 RR Relocation ...
Page 7
... basins and ditches in the abutment . 7 . Construction Materials . - It was estimated that the following quantities would be needed for construction of the dam and appurtenant structures : ( 1 ) Impervious material , cu . yd . 6,537,000 ...
... basins and ditches in the abutment . 7 . Construction Materials . - It was estimated that the following quantities would be needed for construction of the dam and appurtenant structures : ( 1 ) Impervious material , cu . yd . 6,537,000 ...
Page 10
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBR . TRENTON DAM " Right of way boundary 2 Hay Canyony STRATTON P SURFACE 34 T. 3 N. 10 Plan of borrow areas and logs of several test holes 27 28 29 30 31 32 33 CONTENTS (Continued)
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBR . TRENTON DAM " Right of way boundary 2 Hay Canyony STRATTON P SURFACE 34 T. 3 N. 10 Plan of borrow areas and logs of several test holes 27 28 29 30 31 32 33 CONTENTS (Continued)
Page 13
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBRASKA SWANSON RESERVOIR AREA RAILROAD AND HIGHWAY RELOCATION ..... RECOMMENDED . Or thing CHECKED WWW.AO .... APPROVED IN M DENVER , COLORADO APRIL BIDEO 328 - D - 999 Figure 6 ...
... BASIN PROJECT FRENCHMAN - CAMBRIDGE DIVISION - NEBRASKA SWANSON RESERVOIR AREA RAILROAD AND HIGHWAY RELOCATION ..... RECOMMENDED . Or thing CHECKED WWW.AO .... APPROVED IN M DENVER , COLORADO APRIL BIDEO 328 - D - 999 Figure 6 ...
Other editions - View all
Common terms and phrases
accessory cut-off trench acre-feet Approach channel Axis backfill Berm blanket Blockout BUREAU OF RECLAMATION canal outlet centerline channel capacity coarse concrete conduit construction Contraction joint Counterweight crushed rock cutoff trench dam embankment designed discharge drain outlet emergency gate chamber Expansion joint Figure Float flood control floor gate structure gravel ground surface Grouted high-pressure gate Highway bridge holes horizontal hydraulic hydrostatic head inlet installed intake structure Limits of special load located loess material maximum Metal Nebr NORTH BORROW AREA Pierre shale piezometer Pipe handrail PROJ Radial gate railroad reinforcement relocation Republican River reservoir water surface riprap River outlet Rolled embankment SCALE OF FEET second-feet SECTION A-A Settlement point Shale surface Sheet SILT silty slope special compaction spillway crest spillway gates spillway structure steel stilling basin Stoplog storage Sump Sump pump surface at elevation surfaces where directed Trashrack structure Trenton Dam upstream vertical walls water surface elevation