Flood Control in the Mississippi Valley: Hearings...

Front Cover

From inside the book

Selected pages

Other editions - View all

Common terms and phrases

Popular passages

Page 89 - a recess was taken until 1 p, m.. this day). AFTER RECESS The committee reassembled, pursuant to the taking of recess, at
Page 18 - pm, the committee recessed until 2:30 pm) AFTER RECESS The committee reassembled, pursuant to the taking of recess, at 2.30
Page 69 - (3) The maintenance of the present river levees between the head of the Eudora floodway and the northern junction with the protection levee, at the 1914 grade and section, except in front of densely populated areas, as a part of a. ring levee.
Page 58 - RESOLUTION Resolved by the Committee on Flood Control of the House of Representatives, That the Chief of Engineers of the United States Army is hereby requested to
Page 35 - pending completion of any floodway, spillway, or diversion channel, the areas within the same shall be given the same degree of protection as
Page 36 - afforded by levees on the west side of the river contiguous to the levee at the head of said floodway.
Page 35 - determine the best method of securing flood relief in addition to levees, before any flood-control works other than levees and revetments
Page 81 - If you want to ask me any questions, I will be glad to do my best to answer them. Mr.
Page 59 - on Flood Control of the House of Representatives, That the Chief of Engineers of the United States Army is hereby requested to

Bibliographic information