Report of the Chief of Engineers U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1946 - Engineering Includes the Report of the Mississippi River Commission, 1881-19 . |
From inside the book
Results 1-5 of 100
Page 1222
... plant and hired labor : Seventy Six . 2. 155 2. 155 584 65,987 . 28 95 1 ( 1 ) Total 153.25 153.25 Maintenance by United States plant and hired labor .. 1 Work consisted of grading only . 7,578 1.363 3,273 3,970 198 , 423. 91 New work ...
... plant and hired labor : Seventy Six . 2. 155 2. 155 584 65,987 . 28 95 1 ( 1 ) Total 153.25 153.25 Maintenance by United States plant and hired labor .. 1 Work consisted of grading only . 7,578 1.363 3,273 3,970 198 , 423. 91 New work ...
Page 1225
... plant , July 1 , 1945 , to June 30 , 1946 : Dikes and bank protection Project channel dredging Safeguarding structures Snagging Surveys , gages and studies Aids to navigation Cooperative stream gaging Total maintenance 50 , 000. 00 30 ...
... plant , July 1 , 1945 , to June 30 , 1946 : Dikes and bank protection Project channel dredging Safeguarding structures Snagging Surveys , gages and studies Aids to navigation Cooperative stream gaging Total maintenance 50 , 000. 00 30 ...
Page 1263
... plant and hired labor , resulting in removal of 3,346,969 cubic yards of material at a cost of $ 421,827.95 , includ- ing $ 39,399.25 for surveys . Gages and navigation aids were main- tained at a cost of $ 25,032.51 . Operating and ...
... plant and hired labor , resulting in removal of 3,346,969 cubic yards of material at a cost of $ 421,827.95 , includ- ing $ 39,399.25 for surveys . Gages and navigation aids were main- tained at a cost of $ 25,032.51 . Operating and ...
Page 1302
... plant and hired labor ( July 1946 ) Snagging by Government plant and hired labor Total maintenance $ 900 24 , 000 100 25,000 Cost and financial summary Cost of new work to June 1302 REPORT OF CHIEF OF ENGINEERS , U. S. ARMY , 1945.
... plant and hired labor ( July 1946 ) Snagging by Government plant and hired labor Total maintenance $ 900 24 , 000 100 25,000 Cost and financial summary Cost of new work to June 1302 REPORT OF CHIEF OF ENGINEERS , U. S. ARMY , 1945.
Page 1306
... plant and hired labor ( June 1946 ) Total maintenance $ 500 2,000 2,500 The additional sum of $ 2,500 can be profitably expended during the fiscal year 1947 as follows : Maintenance : Preliminary channel dredging surveys by hired labor ...
... plant and hired labor ( June 1946 ) Total maintenance $ 500 2,000 2,500 The additional sum of $ 2,500 can be profitably expended during the fiscal year 1947 as follows : Maintenance : Preliminary channel dredging surveys by hired labor ...
Other editions - View all
Common terms and phrases
accounts payable June Act approved June Act approved Mar allotted from War appropriated to June Appropriation Act approved available June 30 balance available June balance June 30 Balance unexpended June breakwater Chief of Engineers Civil Appropriation Act Condition at end Cong construction Cost and financial Cost of maintenance cost of permanent Creek Department Civil Appropriation dredging end of fiscal ending June 30 Exclusive of available existing project expended in fiscal financial summary Cost fiscal year 1946 Fiscal year ending Flood Control Act Gross amount expended Harbor Act hired labor July June 26 levee liabilities June 30 locks and dams maintenance to June miles Minus accounts payable Mississippi River Missouri River Ohio River Operations and results outer harbor Outstanding liabilities June payable June 30 pier profitably expended project dimensions results during fiscal riprap River and Harbor Total amount appropriated Total expended Unexpended balance June unexpended June 30 Unobligated balance available
Popular passages
Page 1835 - That the following sums of money be, and are hereby, appropriated, to be paid out of any money in the Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 1871 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 1597 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 1387 - The general comprehensive plan for flood control and other purposes in the Missouri River Basin approved by the Act of June 28, 1938, as modified by subsequent Acts, is...
Page 2280 - The range between mean lower low water and mean higher high water or, in places having only one tide daily, the range between mean low water and mean high water.
Page 1559 - That the sum of $12,000,000 is hereby authorized to be appropriated as an emergency fund to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers...
Page 1321 - Hold and save the United States free from claims for damages due to the construction and maintenance of the Improvement...
Page 1559 - Federal-aid highway appropriations, such sums as may be necessary for the immediate prosecution of the work herein authorized, such appropriations to be reimbursed from the appropriation herein authorized when made...
Page 2057 - All depths refer to mean lower low water. The tidal range between mean lower low water and mean higher high water is 5.8 feet.
Page 1673 - Establish a competent and properly constituted public body empowered to regulate the use, growth, and free development of...