Page images
PDF
EPUB
[blocks in formation]

Amount allotted from War Department Civil Appropriation Act approved June 26, 1944--

Amount allotted from War Department Civil Appropriation Act approved Mar. 31, 1945

Amount allotted from War Department Civil Appropriation Act approved May 23, 1941--

$8,500.00

15, 000. 00

Gross amount expended...

Less reimbursements collected_

Balance unexpended June 30, 1945

Outstanding liabilities June 30, 1945---.

Balance available June 30, 1945-

[blocks in formation]

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance 1.

1 Exclusive of available funds.

14, 779. 20

10, 000. 00

32. COLUMBIA RIVER AT BAKER BAY, WASH.

Location.-Baker Bay is a shallow body of water about 15 square miles in extent lying on the north side of the Columbia River near its mouth. The bay is separated from the river by Sand Island, a low-lying sand bar only a few feet above high-tide level. (See U. S. Coast and Geodetic Survey Chart No. 6151.)

Existing project. This provides for a main channel 10 feet deep and 200 feet wide extending through the easterly passage at Sand Island to the port of Ilwaco, a distance of about 5 miles, and for a west channel 8 feet deep and 200 feet wide for a distance of 2,000 feet at the southerly end, thence 150 feet wide, extending from deep water in the Columbia River to the main channel near Ilwaco, a total distance of about 3 miles. Mean lower low later is the plane of reference. The tidal range between mean lower low water and mean higher high water is about 8 feet, and the extreme about 13 feet.

The approved estimate of cost for new work, revised in 1945 to include the west channel, is $248,600. The latest (1945) approved estimate of annual maintenance for the two channels is $30,000.

The main channel was authorized by the Public Works Administration, December 11, 1933, and River and Harbor Act approved August 30, 1935 (H. Doc. No. 44, 73d Cong., 1st sess.), the west channel by River and Harbor Act approved March 2, 1945 (H. Doc. No. 443, 76th Cong., 1st sess.). The latest published maps are in these documents.

672607-46-pt. 1, vol. 2- 62

Terminal facilities.-Terminals have been constructed at Ilwaco along Holman Waterway, 200 feet wide by 3,000 feet in length and on a dredged basin 400 by 1,000 feet. The facilities consist of wharves, floats, ramps, and berths for oil barges and oil boats. The facilities are considered adequate for the present commerce. Operations and results during fiscal year.-Maintenance dredg ing in the channel by the U. S. pipe-line dredge Multnomah removed a total of 241,376 cubic yards of material during July and August 1944 and June 1945 at a cost of $13,983.97. Dredging by the U. S. pipe-line dredge Wahkiakum removed a total of 318,145 cubic yards of material during June 1945 at a cost of $8,843.18. Hydrographic surveys were made as required.

Total costs for the fiscal year were $26,060.71, all for maintenance. Expenditures were $22,210.27.

Condition at end of fiscal year. The existing project is 34 percent complete. The channel extending through the easterly passage at Sand Island to the Port of Ilwaco, Wash., was completed in 1934. The controlling depth is 10 feet with a width of 200 feet. The west channel, extending from deep water in the Columbia River to the main channel near Ilwaco, authorized under the River and Harbor Act approved March 2, 1945, was partially completed with military funds during June 1943 and August 1944. This work consisted of dredging a channel from Ilwaco to Fort Canby, approximately 1 mile, to a depth of from 9 to 11 feet. A total of 372,007 cubic yards was removed. The remaining work required to complete the project is the completion of dredging the west channel to project dimensions.

Total costs have been $183,456.36, of which $78,577.47 was for new work and $104,878.89 for maintenance.

Expenditures have been $179,543.08.

Proposed operations.-The funds unexpended June 30, 1945, plus an anticipated allotment will be applied as follows:

Accounts payable

Maintenance dredging and hydrographic surveys by Government plant and hired labor, June 1946.

Hydrographic surveys

Total

$3, 913. 28

49, 121. 11 2,000.00

55, 034.39

The additional sum of $30,000 can be profitably expended during the fiscal year 1947 for maintenance dredging in the channel between Sand Island and Ilwaco, by Government plant and hired labor, June 1947.

Cost and financial summary

Cost of new work to June 30, 1945

Cost of maintenance to June 30, 1945.

$78,577.47 104, 878.89

Total cost of permanent work to June 30, 1945.

Minus accounts payable June 30, 1945_-

Net total expenditures...

Unexpended balance June 30, 1945

Total amount appropriated to June 30, 1945

183, 456.36

3, 913. 28

179, 543. 08

24, 034.39

203,577.47

[blocks in formation]

Balance unexpended July 1, 1944.

Amount allotted from War Department Civil Appro-
priation Act approved June 26, 1944--
Amount allotted from War Department Civil Appro-
priation Act approved Mar. 31, 1945---

Amount to be accounted for.

Deductions on account of revocation of allotment___

Net amount to be accounted for.

Gross amount expended__.

Less reimbursements collected__

$26, 244.66

$30,000.00

2,000.00

32,000.00

58,244. 66 12,000.00

46, 244. 66

$22, 220.77
10.50

22, 210. 27

[blocks in formation]

Amount (estimated) required to be appropriated for completion
of existing project 1-

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance

1 Exclusive of available funds.

1

[blocks in formation]

33. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL) The total cost of work during the fiscal year was $551,718.78. Expenditures were $548,927.19. The funds unexpended June 30, 1945, including accounts receivable, amounting to $805,104.84, will be applied as needed during the fiscal year 1946 to payment of expenses to be incurred under this heading.

The additional sum of $800,000 can be profitably expended during the fiscal year 1947 for maintenance.

Cost and financial summary

Cost of new work to June 30, 1945.

Cost of maintenance to June 30, 1945.

Total cost of permanent work to June 30, 1945.

Plus accounts receivable June 30, 1945.

Gross total costs to June 30, 1945

Minus accounts payable June 30, 1945

Net total expenditures_

Unexpended balance June 30, 1945–

Total amount appropriated to June 30, 1945_

$2, 286, 722. 66

2, 286, 722. 66 1, 239. 37

2,287, 962. 03 16,093. 60

2,271, 868. 43

803, 865. 47

3,075, 733. 90

[blocks in formation]

Balance unexpended July 1, 1944.

372, 200.00

Amount allotted from War Department Civil Ap-
propriation Act approved Apr. 28, 1942__ --- $100, 000. 00
Amount allotted from War Department Civil Ap-
propriation Act approved June 26, 1944--.
Amount allotted from War Department Civil Ap-
propriation Act approved Mar. 31, 1945---
Amount allotted from War Department Civil Ap-
propriation Act approved June 24, 1940.

Amount to be accounted for.

Gross amount expended_-
Less reimbursements collected.

Balance unexpended June 30, 1945.

Outstanding liabilities June 30, 1945

Balance available June 30, 1945.

740, 000. 00

$40, 592.66

100, 000. 00

1, 312, 200.00

1, 352, 792. 66

$557,577.76
8, 650.57

548, 927. 19

803, 865.47 62,848.90

741, 016. 57

Accounts receivable June 30, 1945.

Unobligated balance available June 30, 1945_.

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance 1.

1 Exclusive of available funds.

1, 239.37

742, 255.94

800, 000.00

34. OTHER NAVIGATION PROJECTS FOR WHICH NO ESTIMATES ARE SUBMITTED

[blocks in formation]

1 Channel adequate for present commerce.

* In addition $322,531.59 was expended by local interests.

3 In addition $304.825.61 was expended from contributed funds.

4 Abandonment of the project was recommended in 1916 (H. Doc. No. 580, 64th Cong., 1st sess.).

B In addition $24,556.30 was expended from contributed funds, $17,556.30 for new work, and $7,000 for maintenance.

Project abandoned due to flooding by Bonneville pool. No commerce reported.

Includes $526.364.99 for operating and care under the permanent indefinite appropriation. Local interests are to contribute two-thirds of cost, or not to exceed $20,000.

35. PLANT allotment, PORTLAND, OREG., DISTRICT
Cost and financial summary

Undistributed costs June 30, 1945.

Net total cost to June 30, 1945–

Plus accounts receivable June 30, 1945----

Gross total costs to June 30, 1945

Minus accounts payable June 30, 1945-

Net total expenditures.

Unexpended balance June 30, 1945

Total amount appropriated to June 30, 1945.

$743, 549.95

743, 549.95 273, 666.24

1, 017, 216. 19 229, 274.89

787, 941. 30 308,885. 38

1,096, 826. 68

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Status of all investigations for navigation called for by river and harbor acts and committee resolutions

[blocks in formation]
« PreviousContinue »