Cost and financial summary

Cost of new work to June 30, 1945
Cost of maintenance to June 30, 1945

Total cost of permanent work to June 30, 1945 Undistributed costs June 30, 1945

Net total cost to June 30, 1945

Plus accounts receivable June 30, 1945

Gross total costs to June 30, 1945 Minus accounts payable June 30, 1945

Net total expenditures

Unexpended balance June 30, 1945

Total amount appropriated to June 30, 1945

1942

1943

[blocks in formation]
[blocks in formation]

$211, 507.49

[blocks in formation]

$158, 119.38
158, 119.38
157, 101. 17

[blocks in formation]
[blocks in formation]

Balance unexpended July 1, 1944
Amount allotted from War Department Civil
Appropriation Act approved June 26, 1944
Amount allotted from War Department Civil
Appropriation Act approved Mar. 31, 1945

Amount to be accounted for

$170,000.00

[blocks in formation]

86, 500.00

256, 500.00

270, 293. 71

$136, 419. 93

603.92

135, 816.01

134, 477.70

[blocks in formation]

Unobligated balance available June 30, 1945

Amount (estimated) required to be appropriated for completion of existing project

2

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance 2

1 Includes $591,161.39 expended on Wisconsin River.

2 Exclusive of available funds.

62.27

134, 415. 43

2, 355. 78

136, 771. 21

1, 161, 300.00

215,000.00

5. STURGEON BAY AND LAKE MICHIGAN SHIP CANAL, WIS. Location. This improvement is on the west shore of Lake Michigan, distant about 52 miles northeasterly from Green Bay and about 128 miles northerly from Milwaukee. (See U. S. Lake Survey Chart No. 728.)

Previous projects.-Adopted by River and Harbor Acts of March 3, 1873, and June 14, 1880. The United States assumed

possession of the canal April 25, 1893, as authorized by the River and Harbor Act of July 13, 1892. The original project for the canal was adopted by the River and Harbor Act of August 18, 1894, modified by River and Harbor Act of June 3, 1896. For further details see page 1935 of Annual Report for 1915 and page 1441 of Annual Report for 1938.

Existing project. This provides for an outer harbor or stilling basin protected by two converging breakwaters, each 1,344 feet in length, extending from the shore on either side of the easterly or Lake Michigan end of the canal; for a revetted canal 7,200 feet in length, varying in width from 160 to 250 feet; for a channel 23 feet deep in rock cut, extending from that depth in Lake Michigan to about 800 feet west of the east entrance of the revetted canal, a length of about 0.6 miles: thence a channel 22 feet deep through an additional 6,400 feet of revetted canal and through Sturgeon Bay to the vicinity of Sherwood Point, a length of about 8 miles, the total length of channel being about 8.6 miles; the width of channel being 600 feet in Lake Michigan, reducing to 200 feet through the harbor and 130 to 220 feet through the revetted canal, thence 250 feet through Sturgeon Bay to a point 5,400 feet northwest of the railroad bridge in the city of Sturgeon Bay and thence 500 feet to the vicinity of Sherwood Point; for a turning basin 20 feet deep, on the southwesterly side of the channel, southeasterly of the highway bridge, and between the city and the Bushman docks; and that the turning basin immediately west of the revetted canal be eliminated from the project. The breakwaters are formed of stone-filled piling and timber cribs and have been provided with concrete superstructures; the revetments are formed of piling and timber, 886 feet having been repaired with concrete superstructure.

The project depth is referred to low-water datum for Lake Michigan, which is 578.5 feet above mean tide at New York. The fluctuations of water level are seasonal changes of about one-half foot above or below the annual mean stage, and extreme fluctuations of a temporary nature, due to wind and barometric pressure, of about 112 feet above or below the mean lake level prevailing at the time.

The estimate of cost for new work, revised in 1945, was $736,300, exclusive of amounts expended on previous projects. The latest (1945) approved estimate for annual cost of maintenance is $80,000.

The existing project was authorized by the following river and harbor acts:

[blocks in formation]

Local cooperation. The act of March 2, 1945, provided that local interests furnish, free of cost to the United States, suitable spoil-disposal areas for the initial work and for subsequent maintenance as required for dredging the turning basin between the city and the Bushman docks. Negotiations for compliance are in progress.

Terminal facilities. As the canal and connecting channel is a through waterway, the only terminal facilities are in the city of Sturgeon Bay, 4 miles from the west end of the revetted portion of the canal. These facilities consist of four coal wharves, four shipbuilding yards, and one package-freight wharf. The city of Sturgeon Bay has provided a public wharf. There is also an inactive large stone wharf located about 5 miles northwesterly from the city of Sturgeon Bay.

Operations and results during fiscal year.-Operations consisted of dredging 32,500 cubic yards of material for restoration of project depth at a cost of $9,264.35. Placing 983 tons of stone as riprap along the north pier, in progress at the close of the previous fiscal year, was completed at a cost of $2,126.26. Repairs to south revetment, including reinforcing and rebuilding of the substructure where necessary, and backfilling, in progress at the close of the fiscal year, cost $27,914.63. All work was done by hired labor and use of Government plant. The total cost was $39,305.24 for maintenance. The total net expenditures were $44,387.62.

Condition at end of fiscal year.-The project in effect prior to the modification of March 2, 1945, was completed in 1942. No work has been done on the last modification of the project providing for a turning basin between the city and the Bushman docks. The harbor entrance piers were completed in 1880, and the canal revetments in 1903. Dredging and rock removal at the easterly entrance to the canal and dredging the channel in the westerly section of the canal was completed in 1940. Deepening and widening the middle section of the canal was completed in 1942.

Pile revetments require repairs and backfilling. The entrance piers are in good condition.

The controlling depth at low-water datum at the close of the fiscal year was 22 feet. The costs under the existing project were $725,303 for new work and $1,077,595.24 for maintenance, a total of

$1,802,898.24. The total expenditures were $1,811,724.93. In addition, the sum of $425,259.17 (including $189,319.35 under previous projects) was expended between April 25, 1893, and June 30, 1917, on the operating and care of the works of improvement under the provision of the permanent indefinite appropriation for such purposes.

Proposed operations.-The balance unexpended at the end of the fiscal year ($92,244.32) plus an additional amount will be applied as follows:

Accounts payable June 30, 1945

Maintenance:

Operation of U. S. hopper dredge Meade, October 1945____
Operation of U. S. dipper dredge Kewaunee, October 1945---
Miscellaneous repairs to revetments and backfilling with
United States plant, August-November 1945 and April-
June 1946

Riprap piers with United States plant, July and November
1945, 2,000 tons at $3.75

Total

$291. 13

10, 453. 19 14,500.00

63,000.00

7,500.00

95, 744. 32

Dredging is required annually for maintenance of project dimensions of channel. The canal revetments are failing and require repairs. The piers require riprap. The additional sum of $92,500 can be profitably expended during the fiscal year ending June 30, 1947, as follows:

Maintenance:

Operation of U. S. dipper dredge Kewaunee during the fall of 1946

Operation of U. S. hopper dredge Meade during fall of 1946-Repairs to revetments with United States plant during the fall of 1946 and spring of 1947

$18,800 10, 200

59, 500

Riprap piers with United States plant during the fall of 1946, 1,000 tons at $4

Total

Cost and financial summary

Cost of new work to June 30, 1945

Cost of maintenance to June 30, 1945

Total cost of permanent work to June 30, 1945

Undistributed costs June 30, 1945

Net total cost to June 30, 1945

Minus accounts payable June 30, 1945

Net total expenditures

Unexpended balance June 30, 1945

Total amount appropriated to June 30, 1945

4, 000 92,500

$1,048, 722. 40 1, 533, 264. 62

2, 581, 987. 02 9, 117.82

2, 591, 104. 84 291. 13

2, 590, 813. 71 92, 244.32

2, 683, 058. 03

[blocks in formation]

Balance unexpended July 1, 1944

Amount allotted from War Department Civil
Appropriation Act approved June 26, 1944-- $65, 000. 00
Amount allotted from War Department Civil
Appropriation Act approved Mar. 31, 1945__

Amount to be accounted for

Deductions on account of revocation of allotment

$12, 131.94

73, 000. 00

138,000.00

150, 131.94

13, 500.00

[blocks in formation]

Amount (estimated) required to be appropriated for com-
pletion of existing project 1

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance1

92,500.00

11,000.00

1 Exclusive of available funds.

6. ALGOMA HARBOR, WIS.

Location.-Algoma Harbor is on the west shore of Lake Michigan, distant about 68 miles from Green Bay via Sturgeon Bay Canal and about 115 miles northerly from Milwaukee. (See U. S. Lake Survey Chart No. 703.)

Previous projects.-Adopted by the River and Harbor Act of March 3, 1871, and modified by River and Harbor Acts of March 3, 1873; March 3, 1875; July 5, 1884; and March 3, 1899. For further details see page 1935 of Annual Report of 1915 and page 1445, Annual Report for 1938.

Existing project.-This provides for an outer harbor 14 feet deep enclosed by a north pier, 1,102 feet long, extending approximately normal to the shore, and a south breakwater, 1,530 feet long, extending from the shore at a point about 1,000 feet south of the remaining 481 feet of the pier on the south side of the channel at the mouth of Ahnapee River, and for a channel of same depth as outer harbor, except where rock is encountered at less depth, extending from that depth in the lake up the river a distance of 1,000 feet from its mouth, a total length of about 2,100 feet; this channel varies in width from 175 to 80 feet at Second Street Bridge. The piers are formed of stone-filled timber cribs and piling and the breakwater of stone-filled timber cribs, concrete caissons, and piling. The north pier and south breakwater have been provided with concrete superstructure.

The project depth is referred to low-water datum for Lake Michigan, which is 578.5 feet above mean tide at New York. The fluctuations of water level are seasonal changes of about one-half foot above or below the annual mean stage and extreme fluctuations of a temporary nature, due to wind and barometric pressure, of about 112 feet above or below the mean lake level prevailing at the time.

The estimate of cost for new work, made in 1907, was $140,000,