Balance unexpended July 1, 1944

Amount allotted from War Department Civil
Appropriation Act approved Apr. 28, 1942 $36, 000. 00
Amount allotted from War Department Civil
Appropriation Act approved Mar. 31, 1945__

[blocks in formation]

12,000.00

$1,900, 931. 34

48, 000. 00

1, 948, 931. 34 85, 400.00

1, 863, 531. 34

$1, 136, 119. 70

Balance unexpended June 30, 1945

Outstanding liabilities June 30, 1945

Amount covered by uncompleted contracts__

[blocks in formation]

$620, 882.86

50, 016. 45

670, 899. 31

85,334.67

27, 200.00

Unobligated balance available June 30, 1945

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance 1

1 Exclusive of available funds.

18. OHIO RIVER BASIN, PITTSBURGH, PA., DISTRICT

Location. The works covered by this project are a series of levees, flood walls, channel improvements, and reservoirs in the Ohio River Basin within the confines of the Pittsburgh, Pa., district.

Existing project.-The Flood Control Act approved August 28, 1937, authorized the construction of levees, flood walls, and drainage structures for the protection of cities and towns in the Ohio River Basin, the projects to be selected by the Chief of Engineers with the approval of the Secretary of War, in accordance with House Flood Control Committee Document No. 1. Seventy-fifth Congress, first session, at a cost not to exceed $24,877,000 for construction, which amount was authorized to be appropriated for this purpose.

The Flood Control Act of June 28, 1938, approved the general comprehensive plan for flood control and other purposes in the Ohio River Basin as set forth in House Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modification thereof as, in the discretion of the Secretary of War and the Chief of Engineers, may be advisable, and for initiation and partial accomplishment of the plan, authorized $75,000,000 for reservoirs and $50,300,000 for local flood-protection works. the individual projects to be selected and approved by the Chief of Engineers subject to the provision that the authorization shall include the diversion of Cache River above Cairo. Ill., and the protection of the area north of the Cairo drainage district by levees. at an estimated cost of $2,000,000.

The Flood Control Act approved August 18, 1941, authorized the sum of $45,000,000 for the further prosecution of the comprehensive plan approved in the act of June 28, 1938, for the Ohio River Basin, modified to include the Allegheny Reservoir project in accordance with the recommendation of the Chief of Engineers in House Document No. 300, Seventy-sixth Congress, first session. In addition to previous authorizations, the Flood Control Act approved December 22, 1944, authorized the sum of $70,000,000 for the prosecution of the comprehensive plan approved in the Act of June 28, 1938, as modified by the act approved August 18, 1941, for the Ohio River, including additional projects in tributary basins.

The following is a list of the individual projects considered in the comprehensive plan within the confines of the Pittsburgh district:

[blocks in formation]
[blocks in formation]

Local cooperation.—See page 5 for requirements.

$9,600,000 4 919,000 22.613,000

4,300,000

5,300.000

6,500,000

5, 400, 000 30,457,000 7,100,000

11.800,000

35,700,000

7,188,000

7,250,000

4. 641,000 3,859,000

Operations and results during fiscal year.-Operations during the year consisted of surveys, investigations, studies, preparation of definite plans, and preparation of construction plans and specifications for the development of the general comprehensive plan for flood control in the Ohio River Basin.

The costs during the year were $156,902.67. The expenditures were $156,247.04.

Condition at end of fiscal year. The preparation of project plans and construction plans and specifications was well advanced. The status of projects selected for construction under this authorization is given in individual reports.

The total costs to the end of the fiscal year were $1,191,635.32, of which $1,169,557.93 was from regular funds and $22,077.39 was from Emergency Relief funds. The total expenditures were $1,183,688.68, of which $1,161,611.29 was from regular funds and $22,077.39 was from Emergency Relief funds.

Proposed operations.-The balance unexpended and accounts receivable on June 30, 1945, amounting to $318,995.28, will be applied to accounts payable June 30, 1945, $8,292.44, and to the preparation of project plans and construction plans and specifications for the development of the general comprehensive plan.

The additional sum of $9,869,100 can be profitably expended during the fiscal years 1946 and 1947 ($4,000,000 of this total in 1946) for the preparation of project plans, construction plans and specifications and for the construction of additional flood protection works included in the general comprehensive plan.

1

[blocks in formation]

Amount that can be profitably expended in fiscal years 1946 and 1947 for new work'

1 Includes $22,077.39 from Emergency Relief funds.

* Exclusive of available funds.

9, 869, 100.00

19. PRELIMINARY EXAMINATIONS, SURVEYS AND
CONTINGENCIES FOR FLOOD CONTROL

The costs during the fiscal year were $139,581.31. The expenditures were $139,607.09.

The balance unexpended on June 30, 1945, plus an allotment of $21,900 in August 1945, a total of $155,177.92 will be applied in payment on accounts payable and expenses to be incurred under this heading.

The additional sum of $71,000 can be profitably expended during the fiscal year 1947.

Cost and financial summary

Cost of new work to June 30, 1945

Cost of maintenance to June 30, 1945

$854, 254.86

Total cost of permanent work to June 30, 1945 Minus accounts payable June 30, 1945

854, 254.86

1, 632. 78

[blocks in formation]

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for maintenance 1

71, 000. 00

1 Exclusive of available funds.