Operations and results during fiscal year.-The operations during the fiscal year, together with costs and expenditures for those projects on which plans were in preparation or on which construction had been initiated, are shown in following individual reports. In addition to the work so detailed, further studies were made of alternate reservoirs in the Republican River Basin. Costs and expenditures during the fiscal year were $599.11 and $662.52, respectively, all from regular funds.

Condition at end of fiscal year.-The condition of the projects discussed in individual reports is given in those reports. Special engineering studies in connection with the comprehensive plan were in progress. The total costs and expenditures to June 30, 1945, all for new work, and exclusive of the costs and expenditures for projects discussed in individual reports, were $55,528.18 and $55,516.25, respectively.

Proposed operations. The unexpended balance of $483.75 will be applied during the fiscal year ending June 30, 1946, to the liquidation of accounts payable of $11.93 and to further investigations in connection with the comprehensive plan.

Additional funds in the amount of $100,000 can be profitably expended during fiscal year 1947 for investigations and studies in connection with the comprehensive plan.

[blocks in formation]

Amount that can be profitably expended in fiscal year ending

June 30, 1947 for new work 1.

1 Exclusive of available funds.

$1, 146. 27 662.52

483.75

50.00

433. 75

$100,000.00

8. MISSOURI RIVER AGRICULTURAL LEVEES SIOUX CITY, IOWA, TO THE MOUTH (RULO, NEBR., TO MOUTH)

Location:-On both banks of the Missouri River from Sioux City, Iowa, to the mouth near St. Louis, Mo., a distance of approximately 760 miles.

Existing project. The plan of improvement provides for a series of levee units and appurtenant works along both sides of Missouri River from Sioux City, Iowa, to the mouth, for the protection of agricultural lands and small communities against floods. The estimate of cost for that portion of the project from Rulo, Nebr., to the mouth is $51,500,000, of which $45,950,000 is the Federal cost for construction, and $5,550,000 is for lands and damages to be borne by local interests. The existing project was authorized by the following flood control acts:

[blocks in formation]

Local cooperation.-Section 3 of the Flood Control Act approved June 22, 1936, as amended by the Flood Control Act approved December 22, 1944, applies. Local cooperation has not been assured. However, various local interests have indicated an interest in the initiation of the project.

Operations and results during fiscal year.-Work in connection with the preparation, by contract, of maps of the Missouri River Valley on which to base future studies and for use in the preparation of project plans was initiated at a cost of $2,008.84 and engineering studies preliminary to the preparation of project plans were in process by hired labor, at a cost of $3,449.37.

The total cost of all work during the fiscal year was $5,458.21 and the total expenditures were $2,628.21, all from regular funds. Condition at end of fiscal year.-Operations in connection with the preparation of maps of the Missouri River Valley from Rulo, Nebr., to the mouth have been initiated by the contractor and preliminary engineering studies were accomplished by hired labor. The total cost, all new work, of the existing project to June 30, 1945, was $5,458.21, and the expenditures were $2,628.21.

Proposed operations.-The unexpended balance of $393,371.79 at the end of the fiscal year will be applied during the fiscal year ending June 30, 1946, as follows:

Accounts payable

New work (July 1, 1945, to June 30, 1946):

By contract: Preparation of maps of Missouri
River Valley from Rulo to the mouth_____
By hired labor: Investigations and plans____

Total for new work

Total for all work

$2,830.00

$308, 879. 01

81, 662. 78

390, 541.79

393, 371. 79

The additional sum of $1,500,000 can be profitably expended during the fiscal year 1947 on the completion of project plans and initiating work on detailed plans.

Cost and financial summary

Cost of new work to June 30, 1945.
Cost of maintenance to June 30, 1945.

Total cost of permanent work to June 30, 1945

Minus accounts payable June 30, 1945---

Net total expenditures..

Unexpended balance June 30, 1945.

Total amount appropriated to June 30, 1945

$5, 458. 21

5, 458. 21 2,830.00

2,628. 21 393, 371. 79

396, 000. 00

[blocks in formation]

Amount allotted from War Department Civil

[blocks in formation]

Appropriation Act approved Mar. 31, 1945__ $246, 000. 00 Amount allotted from First Deficiency Appro

priation, Act 1945, Apr. 25, 1945–

75, 000. 00

Amount to be accounted for..

Gross amount expended.......

Balance unexpended June 30, 1945

321, 000. 00

396,000.00

2,628. 21

393, 371. 79

$5,000. 00

310, 887.85

315, 887.85

77, 483. 94

45, 554, 000. 00

Outstanding liabilities June 30, 1945

Amount covered by uncompleted contracts.

Balance available June 30, 1945.

Amount (estimated) required to be appropriated for comple-
tion of existing project1-

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for new work'

1 Exclusive of available funds.

1, 500, 000. 00

9. ARLINGTON RESERVOIR, MISSOURI RIVER BASIN, MO. Location. The proposed dam site for the Arlington Reservoir is located on the main stem of the Gasconade River, approximately 107 miles above the mouth of the stream, in Phelps County, Mo. The site is about 10 miles west and south of Rolla, Mo., and 45 miles south and east of Jefferson City, Mo., near Arlington, Mo. Existing project.-A preliminary plan of this project provides for a dam about 1,800 feet long to be constructed to an elevation about 117 feet above the river bed. This project is one unit of the general comprehensive plan for flood control and other purposes in the Missouri River Basin authorized by the Flood Control Act

672607-46-pt. 1, vol. 2- -9

approved June 28, 1938 (Flood Control Committee Document No. 1, 75th Cong., 1st sess.) as modified by the Flood Control Act of August 18, 1941 (H. Doc. No. 842, 76th Cong., 3d sess.) and expanded by the Flood Control Act approved December 22, 1944 (H. Doc. No. 475, and Senate Docs. Nos. 191 and 247, 78th Cong., 2d sess.). The estimated cost of the works of improvement and lands and damages based on the preliminary plan is $7,319,000.

Local cooperation.-Section 2 of the Flood Control Act approved June 28, 1938, applies.

Operations and results during fiscal year.-Studies preliminary to the preparation of project plans were initiated at a cost during the fiscal year of $1,541.68 and expenditure of $1,040.35, all from regular funds.

Condition at end of fiscal year.-Preliminary studies to determine the reservoir capacities and type of construction to be used as a criterion in preparing the project plans were in progress at a total cost of $1,541.68 and a total expenditure of $1,040.35, all from regular funds.

Proposed operations.-The unexpended balance on June 30 1945, amounting to $6,459.65, will be applied during the fiscal year 1946, as follows:

Accounts payable

New work (July 1, 1945 to June 30, 1946):

By hired labor: Completion of engineering studies preliminary
to preparation of project plans____

Total

$501.33

5, 958. 32

6, 459. 65

The additional sum of $50,000 can be profitably expended during the fiscal year 1947 for work on project plans.

Cost and financial summary

Cost of maintenance to June 30, 1945.

Cost of new work to June 30, 1945

Total cost of permanent work to June 30, 1945_-.

Minus accounts payable June 30, 1945--

Net total expenditures_

Unexpended balance June 30, 1945.

Total amount appropriated to June 30, 1945.

$1, 541. 68

1, 541. 68 501.33

1,040. 35 6, 459. 65

7,500.00

[blocks in formation]

Amount allotted from War Department Civil Appropriation Act approved Apr. 28, 1942__

Gross amount expended..

Balance unexpended June 30, 1945..

$7,500.00 1, 040. 35

6, 459. 65

Outstanding liabilities June 30, 1945

Unobligated balance available June 30, 1945_-.

Amount (estimated) required to be appropriated for completion
of existing project '-

Amount that can be profitably expended in fiscal year ending
June 30, 1947 for new work

1 Exclusive of available funds.

$700.00 5,759.65

7,311, 500.00

50,000.00

10. RICHLAND RESERVOIR, MISSOURI RIVER BASIN, MO.

Location. The proposed dam site for the Richland Reservoir is located on the main stem of the Gasconade River approximately 170 miles above the mouth of the stream in Pulaski County, Mo. The site is about 10 miles west and south of Waynesville, Mo., and 50 miles south and west of Jefferson City, Mo., near Richland, Mo.

Existing project.-A preliminary plan of this project provides for a dam about 2,200 feet long to be constructed to an elevation about 115 feet above the river bed. This project is one unit of the general comprehensive plan for flood control and other purposes in the Missouri River Basin authorized by the Flood Control Act approved June 28, 1938 (Flood Control Committee Document No. 1, 75th Cong., 1st sess.) as modified by the Flood Control Act of August 18, 1941 (H. Doc. No. 842, 76th Cong., 3d sess.) and expanded by the Flood Control Act approved December 22, 1944 (H. Doc. No. 475, and S. Docs. Nos. 191 and 247, 78th Cong., 2d sess.). The estimated cost of the works of improvement and lands and damages based on the preliminary plan is $6,892,000. Local cooperation.-Section 2 of the Flood Control Act approved June 28, 1938 applies.

Operations and results during fiscal year.—Studies preliminary to the preparation of project plans were initiated at a cost during the fiscal year of $1,503.17 and expenditure of $525.39, all from regular funds.

Condition at end of fiscal year.-Preliminary studies to determine the reservoir capacities and type of construction to be used as a criterion in preparing the project plans were in progress at a total cost of $1,503.17 and a total expenditure of $525.39, all from regular funds.

Proposed operations.-The unexpended balance on June 30, 1945, amounting to $6,974.61, will be applied during the fiscal year 1946, as follows:

Accounts payable

New work (July 1, 1945 to June 30, 1946):

By hired labor: Completion of engineering studies preliminary to preparation of project plans

Total

$977.78

5,996. 83

6, 974. 61

The additional sum of $50,000 can be profitably expended during the fiscal year 1947 for work on project plans.