Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1950 - Harbors |
From inside the book
Results 1-5 of 100
Page 1410
... removal of about 33,000 cubic yards of material by dredging and construction of a dike . Cochrane drainage ditch . - Construction of remedial drainage ditch involving removal of 47,701 cubic yards of material by land plant was completed ...
... removal of about 33,000 cubic yards of material by dredging and construction of a dike . Cochrane drainage ditch . - Construction of remedial drainage ditch involving removal of 47,701 cubic yards of material by land plant was completed ...
Page 1414
... removal of old lateral dam along Le Claire Canal ; partial channel alignment in pool 14 ; addition to pump house and installation of machinery in Union Township drainage district , Missouri ; seepage ditch and remedial works in Des ...
... removal of old lateral dam along Le Claire Canal ; partial channel alignment in pool 14 ; addition to pump house and installation of machinery in Union Township drainage district , Missouri ; seepage ditch and remedial works in Des ...
Page 1443
... removal of four existing bridges , installation of railroad transfer tracks on the left bank , and modification of Illinois Central Railroad facili- ties . The entire project is 20 percent complete . The total costs to June 30 , 1949 ...
... removal of four existing bridges , installation of railroad transfer tracks on the left bank , and modification of Illinois Central Railroad facili- ties . The entire project is 20 percent complete . The total costs to June 30 , 1949 ...
Page 1460
... removal of a total of 86,079 cubic yards of material at mile 6.3 , removal of 289 snags in the reach from Still- water to Taylors Falls , and preliminary dredging surveys were carried out by Government plant and hired labor . Costs for ...
... removal of a total of 86,079 cubic yards of material at mile 6.3 , removal of 289 snags in the reach from Still- water to Taylors Falls , and preliminary dredging surveys were carried out by Government plant and hired labor . Costs for ...
Page 1486
... removal , snag removal , and cut - offs at various locations to provide for increasing the bank - full capacity of the channel . The project , with reservoir capacity of about 94,500 acre - feet for flood control above normal elevations ...
... removal , snag removal , and cut - offs at various locations to provide for increasing the bank - full capacity of the channel . The project , with reservoir capacity of about 94,500 acre - feet for flood control above normal elevations ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet appropriated for fiscal appropriated to June available for fiscal breakwater bridge Chief of Engineers Committee resolution Condition at end Cong construction Control Act approved Cost and financial Cost of maintenance Creek dredging end of fiscal ending June 30 Estimated additional amount expenditures to June feet deep financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Harbor Act hired labor July June 28 Lake Michigan locks and dams Los Angeles River low-water datum maintenance to June miles Mississippi River Missouri River Ohio River Ohio River Basin Operations and results operations.-The balance unexpended outer harbor percent complete pier plans and specifications project depth project was authorized Proposed operations.-The balance reservoir results during fiscal revetment River and Harbor summary Total amount Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin Unexpended balance Unobligated balance available Wabash River