Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1950 - Harbors |
From inside the book
Results 1-5 of 100
Page 1389
... plans and specifications and $ 61.11 for model studies . The expenditures were $ 21,561.74 . Condition at end of fiscal year . - The existing project is about 14 percent complete . No construction work has been started . The total costs ...
... plans and specifications and $ 61.11 for model studies . The expenditures were $ 21,561.74 . Condition at end of fiscal year . - The existing project is about 14 percent complete . No construction work has been started . The total costs ...
Page 1391
... plans and specifications , $ 3,056.44 for soil analysis studies and $ 207.89 for maintenance during construction . Contract costs were $ 1,121,767.46 , of which $ 2,382.63 was for the preparation of plans for gravity drainage structures ...
... plans and specifications , $ 3,056.44 for soil analysis studies and $ 207.89 for maintenance during construction . Contract costs were $ 1,121,767.46 , of which $ 2,382.63 was for the preparation of plans for gravity drainage structures ...
Page 1393
... plan , including the Red Rock Reservoir on the Des Moines River . The Flood Control Act of July 24 , 1946 , authorized an ... plans of Joanna Reservoir on Salt River . Cost and financial summary Cost of new work to June FLOOD CONTROL ST ...
... plan , including the Red Rock Reservoir on the Des Moines River . The Flood Control Act of July 24 , 1946 , authorized an ... plans of Joanna Reservoir on Salt River . Cost and financial summary Cost of new work to June FLOOD CONTROL ST ...
Page 1430
... plans and right - of - way maps in the county court . Action by the drainage district in this matter must be deferred until completion of detailed plans . Modification of the present drainage laws of the State of Illi- nois will also be ...
... plans and right - of - way maps in the county court . Action by the drainage district in this matter must be deferred until completion of detailed plans . Modification of the present drainage laws of the State of Illi- nois will also be ...
Page 1432
... plan approved in the Flood Control Act of June 28 , 1938 , for the Upper Mississippi River Basin , including the ... plans have been submitted to the Governor of Iowa for his review . By action of the Iowa Fifty - third General As ...
... plan approved in the Flood Control Act of June 28 , 1938 , for the Upper Mississippi River Basin , including the ... plans have been submitted to the Governor of Iowa for his review . By action of the Iowa Fifty - third General As ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet appropriated for fiscal appropriated to June available for fiscal breakwater bridge Chief of Engineers Committee resolution Condition at end Cong construction Control Act approved Cost and financial Cost of maintenance Creek dredging end of fiscal ending June 30 Estimated additional amount expenditures to June feet deep financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Harbor Act hired labor July June 28 Lake Michigan locks and dams Los Angeles River low-water datum maintenance to June miles Mississippi River Missouri River Ohio River Ohio River Basin Operations and results operations.-The balance unexpended outer harbor percent complete pier plans and specifications project depth project was authorized Proposed operations.-The balance reservoir results during fiscal revetment River and Harbor summary Total amount Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin Unexpended balance Unobligated balance available Wabash River