Annual Report of the Chief of Engineers, U.S. Army, Part 1, Volume 2U.S. Government Printing Office, 1950 - Harbors |
From inside the book
Results 1-5 of 100
Page 1455
... feet , and about 760,000 acre - feet were discharged , resulting in a net reduc- tion of about 89,300 acre - feet . Mean monthly stages for the fiscal year 1 1948 1949 Reservoir July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May ...
... feet , and about 760,000 acre - feet were discharged , resulting in a net reduc- tion of about 89,300 acre - feet . Mean monthly stages for the fiscal year 1 1948 1949 Reservoir July Aug. Sept. Oct. Nov. Dec. Jan. Feb. Mar. Apr. May ...
Page 1498
... feet of dikes and 18,975 linear feet of revetment , including 13,289 linear feet of accretion paving by rock fill , at a total cost of $ 725,694.20 ; and the accomplishment , by hired labor , of the following : Removal of 3,364,905 ...
... feet of dikes and 18,975 linear feet of revetment , including 13,289 linear feet of accretion paving by rock fill , at a total cost of $ 725,694.20 ; and the accomplishment , by hired labor , of the following : Removal of 3,364,905 ...
Page 1548
... feet , and 8 lengths of revetment totaling 4,609 linear feet ; removal of 1,126 linear feet of existing pile dikes and revetment and clearing for point removal at 1 location ; and strengthening 800 linear feet of pile dikes and 1,683 linear ...
... feet , and 8 lengths of revetment totaling 4,609 linear feet ; removal of 1,126 linear feet of existing pile dikes and revetment and clearing for point removal at 1 location ; and strengthening 800 linear feet of pile dikes and 1,683 linear ...
Page 1652
... feet . 13.3 feet .... ( 10.5 feet , upper . 10.3 feet , lower . Rock ... Fixed . Stone masonry lock , timber crib dam . Nov. 26 , 1904 ... $ 490,010.77 . Lock B Hickory Point , Tenn . , 211⁄2 miles . 140.3 miles . 52 by 280 feet ...
... feet . 13.3 feet .... ( 10.5 feet , upper . 10.3 feet , lower . Rock ... Fixed . Stone masonry lock , timber crib dam . Nov. 26 , 1904 ... $ 490,010.77 . Lock B Hickory Point , Tenn . , 211⁄2 miles . 140.3 miles . 52 by 280 feet ...
Page 1653
... feet wide and 800 feet long , is esti- mated as $ 43,500,000 . The prosecution of the authorized modifica- tion of the existing project on the Cumberland River will eliminate locks A to F , inclusive , below Nashville , and lock 1 ...
... feet wide and 800 feet long , is esti- mated as $ 43,500,000 . The prosecution of the authorized modifica- tion of the existing project on the Cumberland River will eliminate locks A to F , inclusive , below Nashville , and lock 1 ...
Other editions - View all
Common terms and phrases
1st sess 2d sess Accounts payable acre-feet appropriated for fiscal appropriated to June available for fiscal breakwater bridge Chief of Engineers Committee resolution Condition at end Cong construction Control Act approved Cost and financial Cost of maintenance Creek dredging end of fiscal ending June 30 Estimated additional amount expenditures to June feet deep financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Harbor Act hired labor July June 28 Lake Michigan locks and dams Los Angeles River low-water datum maintenance to June miles Mississippi River Missouri River Ohio River Ohio River Basin Operations and results operations.-The balance unexpended outer harbor percent complete pier plans and specifications project depth project was authorized Proposed operations.-The balance reservoir results during fiscal revetment River and Harbor summary Total amount Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin Unexpended balance Unobligated balance available Wabash River