Integrated Production, Control Systems: Management, Analysis, and DesignFocuses on the quantitative approaches necessary to computer-integrated manufacturing systems, and integrates major topics covering all phases of the production control cycle: production information processing and flow, production planning, forecasting, material requirements planning and monetary control, and scheduling. This new edition features a compendium set of 11 user-friendly computer programs for the IBM PC that enhance the teaching power of the text, allowing readers to solve real-life problems. Among programs included are growth forecasting, aggregate planning, material requirements planning, lot sizing and inventory control, and limited-resource scheduling. The chapters on scheduling give particularly thorough coverage on this difficult subject. Solutions are clearly presented, with many examples and exercises included in the text. |
From inside the book
Results 1-3 of 50
Page 251
... assigned to machine tools . If there is a choice of machines , considerations such as quality , setup costs , preventive maintenance , and operator availability may dictate the assignment . If all else is equal , a good rule would be to ...
... assigned to machine tools . If there is a choice of machines , considerations such as quality , setup costs , preventive maintenance , and operator availability may dictate the assignment . If all else is equal , a good rule would be to ...
Page 351
... assigned a TSTART of zero . From the network of Figure 9.6a it is seen that assigning activity A allows activity B to be scheduled a TEARL of five time units later ( activity A's TFIN ) . Similarly , activities D and F can be assigned a ...
... assigned a TSTART of zero . From the network of Figure 9.6a it is seen that assigning activity A allows activity B to be scheduled a TEARL of five time units later ( activity A's TFIN ) . Similarly , activities D and F can be assigned a ...
Page 378
... assigned for the completion of assigned tasks at each work station . If it is desired that at least 99.4 percent of all work assigned to an assembly line for a product be completed at standard working rates under the cycle time provided ...
... assigned for the completion of assigned tasks at each work station . If it is desired that at least 99.4 percent of all work assigned to an assembly line for a product be completed at standard working rates under the cycle time provided ...
Contents
THE ROLE OF PRODUCTION CONTROL | 1 |
INFORMATION FLOW | 18 |
FORECASTING | 59 |
Copyright | |
15 other sections not shown
Other editions - View all
Common terms and phrases
ACTIM activity aggregate planning algorithm allow analysis approach assembly assigned assumed BASICA batch BEGIN INVENTORY Box-Jenkins calculate carrying costs Chapter completion component considered constraints critical path cycle Data Set determine due date Equation error example problem exponential smoothing factors follows forecasted demand function function key Gantt chart given in Figure GROSS REQUIREMENTS historical data Industrial Engineering input inventory costs inventory item inventory level KANBAN Line Balancing line-of-balance linear linear model machine makespan manufacturing master schedule MATERIAL REQUIREMENTS PLANNING maximum mean tardiness minimize minimum needed node operation optimal order costs order quantity output overtime parameters percent period personal computer procedure processor production control purchase quadratic RECPT regression regression analysis resource safety stock sequence shift shown in Figure solution step storage Tandem Computers technique total cost units values vendor week