Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][merged small][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][ocr errors][merged small][merged small][subsumed][subsumed][ocr errors][subsumed][subsumed][subsumed][merged small][subsumed][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][graphic][merged small][merged small][merged small][merged small][merged small]

CRETE STRUCTURE DESIGN

AL. The criteria for determining the et conduits were: (1) Discharge about t per second at reservoir elevation 3547 tion needs without dependence on ases, and (2) velocities in the conduit eed 70 feet per second at maximum Two outlets were installed in the dam. t is used to supply irrigation needs. The or evacuation outlet, is provided for uation of the reservoir. This outlet was andling the river discharge during the I to close the diversion tunnel. The he intakes are set at elevation 3400 for outlet and elevation 3300 for the et.

consists of an 84-inch-diameter steelth a cast iron bellmouth intake, a ate for emergency closure, a hollow-jet tion, and a stilling basin. The entrances are protected by a semicircular reinte trashrack structure provided with racks. The trashrack structure extends 572.7 which is about 26 feet above the active space. A bulkhead gate on the of the dam was provided to permit er outlet for subsequent examination or e steel-lined pipe and the ring-follower arrangements of the outlet works are e 73.

TION OF LOCATION. Because the Iding occupied the entire bottom width the best arrangement for the outlets in n a 60-foot-wide block immediately to e penstock blocks. The intakes to the piggyback at different elevations, but come parallel in plan after the second d at elevation 3197. The centerline en the outlets in this parallel area, 22 as dictated by the required stilling basin r the combined bends were established diameters. The outlets extend through outlet valve house located between the and the powerplant building to the right of the transformer deck area. The right-follower gates and the hollow-jet valves are located in this outlet

valve house. A hollow-jet valve stilling basin was used to dissipate hydraulic energy at the downstream end of the outlet works controls. To reduce cost and save space, a portion of the stilling basin was constructed within the powerplant building beneath the machine shop, and extended downstream beneath a portion of the powerplant service area for approximately 112 feet.

61. MODEL STUDIES. A hydraulic model1, built to a geometrical scale of 1:28, included the two hollow-jet valves, the stilling basin, the powerplant afterbay, and a section of the excavated channel downstream from the afterbay. The model studies were conducted to develop a stilling basin that would operate satisfactorily for a higher-than-normal tailwater resulting from storage in a downstream conservation pool, and for a low tailwater when there is virtually no storage in the pool. The model investigation was also concerned with flow conditions in the powerplant afterbay and in the channel downstream from the afterbay. As a result of the model studies, the preliminary stilling basin design was modified to allow for satisfactory operation at low tailwater. The model studies also indicated that channel bank protection would be required immediately downstream from the basin, and suggested that the bank should be protected with 3-foot-size rocks.

62. REINFORCEMENT AROUND THE OUTLETS. The major portion of the outlet conduits, except for critical locations, was not reinforced. This criterion was based on the proposition described previously under section 37 (f). The following design assumptions or procedures were used in determining the reinforcement for the critical locations:

(1) Temperature differential effect was assumed to vary linearly from 0° F. at the upstream face of the dam to 4° F. at the downstream face of the dam, and act through a 5-foot-thick ring of

concrete.

(2) For computing bursting pressure, a hydrostatic head equivalent to the difference between the centerline elevation of the pipe and a reservoir water surface elevation 3657 was used.

Rhone, T. J., "Hydraulic Model Studies of Yellowtail Dam Outlet Works," Hydraulic Laboratory Report No. Hyd-482, Bureau of Reclamation, February 14, 1962 (unpublished).

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

2/Internal memorandum "Contact Pressures between Circular Cylinders of Different Materials," from W. T. Moody to F. M. Holdaway, July 29, 1955 (unpublished).

*Unpublished.

3/Internal memorandum "Stress Distribution on Radial Lines around a Circular Hole in an Infinite Plate," from C. N. Zenger to Max Ford, January 16, 1950 (unpublished).

gates were determined for the following two loading conditions:

Condition No. 1-Full bursting pressure within the gate frame and bonnet.

Condition No. 2-Ring-follower gate closed, and unbalanced force of full hydrostatic pressure on gate.

The vertical bend downstream from the ringfollower gates was reinforced for the following three loading conditions:

Condition No. 1-85 percent of full bursting pressure.

Condition No. 2-Anchorage reinforcement for unbalanced force due to the bend.

Condition No. 3-Hollow-jet valve closed and the ring-follower gate open, and unbalanced force of full hydrostatic pressure acting on the bend.

63. STILLING BASIN. The hydraulic design of the stilling basin was based on the design of hollow-jet valve stilling basins-Basin VIII in the Bureau of Reclamation Engineering Monograph No. 25, "Hydraulic Design of Stilling Basins and Energy Dissipators." The stilling basin was designed for 2,500 cubic feet per second discharging through each hollow-jet valve, or a total of 5,000 cubic feet per second, at the maximum reservoir elevation. After extensive model studies, the level portion of the stilling basin was made 116 feet long and 40 feet wide with a 4-foot 4-inch wide divider wall along the basin centerline. The basin floor was set at elevation 3147.50. At the upstream end of the basin, the floor slopes upward to the hollow-jet valves on a 30° angle. Wedge-shaped blocks converge the width of the upstream part of each compartment of the basin from 17 feet 10 inches at the valves to 4 feet 10 inches at the end of the sloping floor. At the downstream end of the wedges, each compartment abruptly widens to 17 feet 10 inches. To provide structural stability, a roof across the top of the stilling basin was provided to tie the divider wall and the sidewalls together. Although this modification was not tested in the model, it was approved on the basis that the ceiling of the roof be placed at elevation 3194.0, 1.5 feet above the maximum tailwater. Details of the basin are shown on figures 74, 131, and 134.

[blocks in formation]

4/Internal memorandum "Uplift Pressures on Outlet Stilling Basin-Yellowtail Dam-Missouri River Basin Project," from I. E. Allen and H. B. Phillips to Chief, Dams Branch, September 11, 1961 (unpublished).

[blocks in formation]
« PreviousContinue »