Page 17
... started at the bottom of a cut mode by a D - 6 dozer which unsuccessfully attempted to reach rock . Depths on this log are from the ground surface at the bottom of the excavation which is 11.8 below the original ground surface Woter ...
... started at the bottom of a cut mode by a D - 6 dozer which unsuccessfully attempted to reach rock . Depths on this log are from the ground surface at the bottom of the excavation which is 11.8 below the original ground surface Woter ...
Page 23
... started in 1956 , when an attempt was made to locate areas containing more suitable materials than those previously tested . However , after a review of materials sources available , recommendations were made for a thorough ...
... started in 1956 , when an attempt was made to locate areas containing more suitable materials than those previously tested . However , after a review of materials sources available , recommendations were made for a thorough ...
Page 69
... started work under the contract on October 27 , 1958 , 5 days before the effective date of the notice to proceed . All work under the con- tract was completed and accepted by the Government on February 28 , 1961. The contrac- tor ...
... started work under the contract on October 27 , 1958 , 5 days before the effective date of the notice to proceed . All work under the con- tract was completed and accepted by the Government on February 28 , 1961. The contrac- tor ...
Page 75
... started on September 25 , 1961 , and was completed on October 18 , 1961 , the final completion date . Final acceptance by the Government was made on October 26 , 1961 , after the installation had been tested and approved by the State of ...
... started on September 25 , 1961 , and was completed on October 18 , 1961 , the final completion date . Final acceptance by the Government was made on October 26 , 1961 , after the installation had been tested and approved by the State of ...
Page 77
... started Keystone Construction Co. , Inc. , the contractor for construction of Prineville Dam under specifications No. DC - 5047 , erected an earth protection dike in front of the tunnel inlet and allowed the river to remain in its ...
... started Keystone Construction Co. , Inc. , the contractor for construction of Prineville Dam under specifications No. DC - 5047 , erected an earth protection dike in front of the tunnel inlet and allowed the river to remain in its ...
Common terms and phrases
access shaft acre-feet adit Air inlet pipe Anchor bars approx backfill BASALT borrow area BOULDERS reported breccia brown sand BUREAU OF RECLAMATION CALCITE columnar basalt concrete construction contractor crest Crooked River project CYLINDER dense DENVER depth DOME downstream drain elevation embankment Figure fine-grained floor fragments gate chamber GRAVEL GRAVEL and BOULDERS grout HARD TO EXCAVATE hoop stress installed intake structure large amt left abutment LIMIT OF EQUIPMENT load measured when hole PALAGONITE pounds per square Prineville Dam PROJ DH pumice REACHED LIMIT RECLAMATION CROOKED RIVER reported by drillers reservoir water right abutment riprap SCALE OF FEET SECTION shaft house SILT SILTY SAND slightly vesicular slightly weathered slope small roots spillway spillway and outlet square inch station steel stilling basin stress subangular TALUS Total hoop tunnel upstream vertical vesicles vesicular wall wash sample contained Water level measured Water loss water-cement ratio YARD BACKHOE zone
Popular passages
Page 70 - Officer in writing of: (1) subsurface or latent physical conditions at the site differing materially from those indicated in this contract, or (2) unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in this contract.
Page 126 - Stresses were determined using the general theory of cylindrical and hemispherical shells in which the thickness of the shell is small compared to the radius of the cylinder or hemisphere. In the present analysis, thicknesses of 0.15R and 0.20P were used. With wall dimensions of these magnitudes, the usual "membrane...