Page images
PDF
EPUB
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Selected bibliography:

APPENDIX F

Articles in Technical Press

Pacific Builder and Engineer, "Earthfill Dam First Big Job for Prineville Contractor, " June 1959, pp. 76-77.

Bureau of Reclamation Laboratory Reports (unpublished)

No. C-711C, "Aggregate, Plant Processed Sand and Gravel, Prineville Sand and Gravel
Company, Prineville Dam, Specifications No. DC-5047, Crooked River Project, "
R. N. Hess, October 20, 1961.

No. C-907, "Aggregate, Pit Run Sand and Gravel, Area 'A' Test Pit 306 (Depth 4.5 to 15.0 Feet), Prineville Dam, Crooked River Project, " B. McConnell, August 25, 1961.

No. EM-72, "Report of Laboratory Tests on Proposed Earth Materials for Prineville
Dam, Crooked River Project, " June 11, 1945.

No. EM-527, "Laboratory Tests on Proposed Borrow Materials, Prineville Dam, Crooked River Project, " W. Ellis, April 16, 1958.

No. Hyd-452, "Hydraulic Model Studies of the Spillway and Outlet Works for Prineville Dam, Crooked River Project, Oregon, " W. P. Simmons, Jr., June 1, 1959.

Bureau of Reclamation Technical Reports (unpublished)

"Preliminary Geologic Report on the Prineville Dam Site, Crooked River Project, Oregon," C. J. Okeson, March 1944.

"Preliminary Design and Estimate, Prineville Dam, Crooked River Project, Oregon, Foster Towle, November 1945.

[ocr errors]

"Preliminary Design and Estimate, Prineville Dam, Crooked River Project, Oregon, " April 1949.

"Supplemental Geological and Materials Report on Prineville Dam Site, Crooked River Project, Oregon, " J. L. Tengesdal, August 1957.

"Tailwater Studies for Prineville Dam Site and Crooked River Diversion Dam Site, Crooked River Project, Oregon, " September 1957.

"Definite Plan Report, Crooked River Project, Oregon, " June 1958.

་་

"Specifications No. DC-5047, Prineville Dam, Crooked River Project, Oregon, " July 9, 1958.

"Zoning Report, Prineville Dam, Crooked River Project, Oregon, " March 1959.

"Geologic Log of Diversion Tunnel, Adit and Elevator Shaft at Prineville Dam, Crooked River Project, Oregon, " M. H. Logan, July 1959.

"Final Grout Report of the Outlet Works Tunnel, Prineville Dam, Crooked River Project, Oregon," February 1960.

"Final Grout Report of the Spillway Crest, Prineville Dam, Crooked River Project, Oregon," February 1960.

"Right and Left Abutment Grout Report, Prineville Dam, Crooked River Project, Oregon, February 1960.

[ocr errors]

APPENDIX F--Continued

"Final Report for Surface Settlement Point Installations, Prineville Dam, Crooked River Project, Oregon, " October 1961.

"Geologic Report on Prineville Dam, Crooked River Project, Oregon, " M. H. Logan and C. J. Okeson, November 1961.

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
« PreviousContinue »