Davis Dam and Powerplant: Technical Record of Design and Construction, Davis Dam Project, Constructed 1942-53 |
Contents
60 | |
66 | |
67 | |
69 | |
74 | |
75 | |
78 | |
87 | |
97 | |
99 | |
103 | |
104 | |
106 | |
107 | |
109 | |
114 | |
119 | |
123 | |
126 | |
132 | |
145 | |
228 | |
241 | |
248 | |
253 | |
254 | |
259 | |
287 | |
293 | |
299 | |
303 | |
305 | |
309 | |
310 | |
324 | |
343 | |
349 | |
351 | |
357 | |
365 | |
372 | |
376 | |
Other editions - View all
Common terms and phrases
20 feet A-line anchor bars axis B-zone backfill block blockouts broken Gneiss C-zone grouting cement clay seams cofferdam Colorado River completed concrete concrete was placed construction contraction joints cubic feet cubic yards cutoff trench Davis Dam deck depth downstream drain drilling and grouting elevation equipment excavation fault zone feet per second flow foot forebay channel forms foundation French drains gallery gantry crane gate girders gravel gravity wall grout holes hoist Hoover Dam horizontal installed intake structure Lake Mead Lake Mohave lift load located material maximum operation outlet structure penstock piers pipe plant Porphyritic pounds per square powerplant pozzolan pressure pumps Pyramid Canyon rhyolite riprap river rock sand SCALE OF FEET scrollcase seal side slope specifications spillway and outlet square inch steel stilling basin stockpile stoplogs stresses surface switchyard tests tion transformer trashrack turbine unit upstream vertical welded