Congress have generally specified iuwhich part the money appropriated was to be expended. The divisions are as follows: 1. Above Hartford, Connecticut. — Embracing a length of about 66 miles, from Hartford, Conn., to Miller's Falls, Mass. 2. Below Hartford,... Annual Report of the Secretary of War - Page 592by United States. War Department - 1890Full view - About this book
| United States. War Department. Corps of Engineers - Engineering - 1889 - 954 pages
...•KlS* March 3, 1£81 i,m Do Aug 2, 1882 •,<w Do... July 5 1884 (• Do Ang 6, 18M SW Total liTS burgh is 180 miles above Bellows Falls. A preliminary examination was made, the report on which, printed in the Annual tleport of the Chief of Engineers for 1884, Part 1, page 659, recommended no survey and... | |
| United States. Army. Corps of Engineers - Engineering - 1885 - 1130 pages
...Connerticut. — Embracing a length of about 66 miles from Hartford, Conn, to Miller's Falls, Mass. ('2) Below Hartford, Connecticut. — Embracing a length of about 50 miles from Hartford to the mouth of the river at Saybrook Point. (i) ABOVE HARTFORD, CONNECTICUT. Miller's Falls, Mass., is... | |
| United States. War Department - 1885 - 1004 pages
...Connecticut. — Embracing a length of about 66 miles from Hartford, Conn, to Miller's Falls, Mass. (2) Below Hartford, Connecticut. — Embracing a length of about 50 miles from Hartford to the mouth of the river at Saybrook Point. (1) ABOVE HARTFORD, CONNECTICUT. Miller's Falls, Mass., is... | |
| United States. War Department - 1886 - 908 pages
...Connecticut. — Embracing a length of about W> miles, from Hartford, Conn., to Miller's Falls, Mass. 2. Below Hartford, Connecticut. — Embracing a length of about 50 miles, from Hartford to Long Island Sound. (1) ABOVK HARTFORD, OOUNKOTICUT. Miller's Falls, Mass., is at the head of possible navigation of the... | |
| United States. War Department - 1888 - 852 pages
...Connecticut. — Embracing a length of about GO miles, from Hartford, Conn., to Miller's Falls, Mass. 2. Below Hartford, Connecticut. — Embracing a length of about...of 1882 an examination or survey of the Connecticut Eiver, frcin Bellows Falls, Vt., to Pittsburgh, NH, was authorized. Bellows Falls is about 105 miles... | |
| United States. Army. Corps of Engineers - Engineering - 1888 - 864 pages
...— Embracing a length of about 66 xniles, from Hartford, Conn., to Miller's Falls, Mass. 2. Below Hartford, Connecticut. — Embracing a length of about...harbor act of 1882 an examination or survey of the Uonuecticnt Itiver, frtm Bellows Falls, Vt., to Pittsburgh, N. II., was authorized. Bellows Falls is... | |
| United States. Army. Corps of Engineers - 1888 - 882 pages
...Connecticut. — Embracing a length of about CO miles, from Hartford, Conn., to Miller's Falls, Mass. 2. Below Hartford, Connecticut. — Embracing a length of about...and harbor act of 1882 an examination or survey of tho Connecticut River, from Bellows Falls, Vt., to Pittsburgh, NH, was authorized. Bellows Falls is... | |
| United States. Army. Corps of Engineers - 1889 - 954 pages
...Conn., to Miller's Falls, Mass. 2. Below Hartford, Connecticut. — Embracing a length of about 60 miles from Hartford to Long Island Sound. By the river...Bellows Falls is about 105 miles above Hartford, and PittaApplication. Date. Amount. Jane 14 1880 •$•_' 500 Do , March 3, 1881 4,300 Do... Aug 2, 1882... | |
| |