Hidden fields
Books Books
" Avenue to the navigation turning basin ; all generally in accordance with the plans of the district engineer, and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable... "
Annual Report of the Chief of Engineers, U.S. Army - Page 1570
by United States. Army. Corps of Engineers - 1953
Full view - About this book

Report of the Chief of Engineers U.S. Army, Volume 2, Part 1

United States. Army. Corps of Engineers - Engineering - 1952 - 1706 pages
...Samoa Channels over their existing project widths from mile 4.29 to miles 5 and 5.84 respectively; generally in accordance with the plans of the district...advisable; at an estimated cost to the United States of $406,500 for construction and $49,500 annually for maintenance in addition to that now required; subject...
Full view - About this book

Report of the Chief of Engineers U.S. Army, Volume 1, Part 1

United States. Army. Corps of Engineers - Engineering - 1952 - 1520 pages
...feet long in Turtle Cove adjacent to the existing channel and turning basin at Port Aransas, Tex., with such modifications thereof as in the discretion...advisable at an estimated cost to the United States of $30,000 for new work and $1,000 annually for maintenance in addition to that now required (H. Doc....
Full view - About this book

Report of the Chief of Engineers U.S. Army, Volume 2, Part 1

United States. Army. Corps of Engineers - Engineering - 1950 - 1522 pages
...existing channel line at a point, 1,640 feet easterly of the bend, generally in accordance with the plan of the district engineer and with such modifications...of Engineers may be advisable, at an estimated cost of $329,900 for new work and $4,000 annually for additional maintenance, subject to the requirement...
Full view - About this book

Report of the Chief of Engineers U.S. Army, Volume 2, Part 1

United States. Army. Corps of Engineers - Engineering - 1950 - 1550 pages
...Street highway bridge over Dyke Creek and the Baltimore & Ohio Railroad bridge over Genesee River, with such modifications thereof as in the discretion of the Chief of Engineers may be advisable. The estimated Federal cost for construction, revised in 1950, is $745,000, exclusive of $50,000 to...
Full view - About this book

Flood Control: Hearings Before a Subcommittee of the Committee on Commerce ...

United States. Congress. Senate. Committee on Commerce - Flood control - 1944 - 838 pages
...comprehensive plan approved in the Act of June 28, 1!)38, for the Willamette River Basin, with sucli modifications thereof as in the discretion of the Chief of Engineers may be advisable. COLUMBIA RIVER BASIN The projects on the Snake River for local flood protection at Hcise. Roberts,...
Full view - About this book

Flood Control: Hearings Before a Subcommittee of the Committee on Commerce ...

United States. Congress. Senate. Committee on Commerce - Flood control - 1944 - 848 pages
...Mountain Dam and Reservoir, together with certain levee and channel improvements, all substantially iu accordance with the plans of the district engineer and with such modifications thereof as may be advisable in the discretion of the Secretary of War and the Chief of Engineers, at an estimated...
Full view - About this book

Rivers and Harbors: Hearings, Seventy-ninth Congress, Second Session, on H.R ...

United States. Congress. Senate. Committee on Commerce - Harbors - 1946 - 536 pages
...maintenance by the Federal Government, substantially in accordance with the plans outlined in his report, with such modifications thereof as in the discretion...of Engineers may be advisable, at an estimated cost of $900,000 for initial construction and $25,000 for annual maintenance, with provision for extension...
Full view - About this book

Flood Control: Hearings, Seventy-ninth Congress, Second Session, on H.R ...

United States. Congress. Senate. Committee on Commerce - Flood control - 1946 - 268 pages
...of channel improvements on Rock Creek and Polecat Creek below the mouth of Rock Creek in substantial accordance 'with the plans of the district engineer...modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable, at an estimated first cost to the United...
Full view - About this book

Flood Control: Hearings, Seventy-ninth Congress, Second Session, on H.R ...

United States. Congress. Senate. Committee on Commerce - Flood control - 1946 - 262 pages
...of channel improvements on Rock Creek and Polecat Creek'below the mouth of Rock Creek in substantial accordance with the plans of the district engineer...modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable, at an estimated first cost to the United...
Full view - About this book

Big Sandy River and Tug and Levisa Forks, Ky., W. Va., and Va. Hearings ...

United States. Congress. House. Committee on Rivers and Harbors - 1946 - 420 pages
...above comments and with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable, at an estimated cost to the United States of $82,300,000 for new work and $600,000 annually for maintenance and operation ; subject to the conditions...
Full view - About this book




  1. My library
  2. Help
  3. Advanced Book Search
  4. Download EPUB
  5. Download PDF