Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 82
Page
... wall : 925 cubic yards Location : East and right abutment of the dam , between the dam and the powerplant Type : Ogee weir surmounted by two 30- by 25 - foot radial gates Crest elevation : 4700.00 Capacity : 20,000 second - feet with ...
... wall : 925 cubic yards Location : East and right abutment of the dam , between the dam and the powerplant Type : Ogee weir surmounted by two 30- by 25 - foot radial gates Crest elevation : 4700.00 Capacity : 20,000 second - feet with ...
Page ii
... walls ( i ) Chute walls ( j ) Chute floor ( k ) Stilling basin walls ( 1 ) Stilling basin floor Structural details ( a ) Approach channel ( b ) Left inlet wall ( c ) Right inlet wall ( d ) Inlet apron ( e ) Gate structure ( f ) Spillway ...
... walls ( i ) Chute walls ( j ) Chute floor ( k ) Stilling basin walls ( 1 ) Stilling basin floor Structural details ( a ) Approach channel ( b ) Left inlet wall ( c ) Right inlet wall ( d ) Inlet apron ( e ) Gate structure ( f ) Spillway ...
Page xiii
... walls 218 86 View of powerplant during construction , showing formwork for superstructure 218 87 View of powerplant during construction 220 88 View showing concrete encasement in progress at downstream penstock 221 89 View of trashrack ...
... walls 218 86 View of powerplant during construction , showing formwork for superstructure 218 87 View of powerplant during construction 220 88 View showing concrete encasement in progress at downstream penstock 221 89 View of trashrack ...
Page 6
... wall Azis of door Crest EL 4758 Original groun Stripped foundation Sound rock surface SECTION IN RIVER CHANNEL of spillway . Crest El . 4758 Construction joint- Min Grout hoies on 10 crs Axis of dom 3 ' - 0 " 3 ° Grown - Roadway crest ...
... wall Azis of door Crest EL 4758 Original groun Stripped foundation Sound rock surface SECTION IN RIVER CHANNEL of spillway . Crest El . 4758 Construction joint- Min Grout hoies on 10 crs Axis of dom 3 ' - 0 " 3 ° Grown - Roadway crest ...
Page 7
... wall Tunnel plug Diversion tunnel- PROFILE ON OF SPILLWAY -El 4650 -El 4594 100 O 100 SCALE OF FEET 200 300 Headwall Radial gate hoist Handrail EI 4733.25 EI . 4725.00 -El . 4690.00 --Radial gates Cut - off wall Top of rock- SECTION A ...
... wall Tunnel plug Diversion tunnel- PROFILE ON OF SPILLWAY -El 4650 -El 4594 100 O 100 SCALE OF FEET 200 300 Headwall Radial gate hoist Handrail EI 4733.25 EI . 4725.00 -El . 4690.00 --Radial gates Cut - off wall Top of rock- SECTION A ...
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone