Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 100
Page
... units : 2 Installed capacity : Two 8 , 333 - kv . -a . generators with 90 percent power factor Turbines : Francis ... unit with two outgoing lines , one trans- former circuit from powerplant roof and provision for one future outgoing ...
... units : 2 Installed capacity : Two 8 , 333 - kv . -a . generators with 90 percent power factor Turbines : Francis ... unit with two outgoing lines , one trans- former circuit from powerplant roof and provision for one future outgoing ...
Page iii
... Unit cooling ( a ) Drainage and unwatering system 58 . ( b ) Speed control ( c ) Gate position and limit control ( d ) Auxiliary gate controls Unit auxiliaries ( a ) Generator and turbine bearing lubrication 59. Auxiliary and service ...
... Unit cooling ( a ) Drainage and unwatering system 58 . ( b ) Speed control ( c ) Gate position and limit control ( d ) Auxiliary gate controls Unit auxiliaries ( a ) Generator and turbine bearing lubrication 59. Auxiliary and service ...
Page vii
... unit substation , etc. Specifications No. 2833 156 110. Generator - voltage switchgear and protective equipment-- Specifications No. 2971 156 111. Steel structures for switchyard and transmission line-- Specifications No. DS - 3220 112 ...
... unit substation , etc. Specifications No. 2833 156 110. Generator - voltage switchgear and protective equipment-- Specifications No. 2971 156 111. Steel structures for switchyard and transmission line-- Specifications No. DS - 3220 112 ...
Page xii
... 80 View of winding in stator of generator No. 2 209 81 Lowering the 60 - ton rotor into position for generator No. 2 209 82 View of burned area in stator of unit 1 212 LIST OF FIGURES ( Continued ) Figure Title Page 83 xii.
... 80 View of winding in stator of generator No. 2 209 81 Lowering the 60 - ton rotor into position for generator No. 2 209 82 View of burned area in stator of unit 1 212 LIST OF FIGURES ( Continued ) Figure Title Page 83 xii.
Page 1
... unit powerplant is located at the downstream end of the outlet works at the toe of the dam . The Boysen unit is readily accessible by the Chicago , Burlington , and Quincy Railroad and by a good paved highway , U. S. No. 20 , which were ...
... unit powerplant is located at the downstream end of the outlet works at the toe of the dam . The Boysen unit is readily accessible by the Chicago , Burlington , and Quincy Railroad and by a good paved highway , U. S. No. 20 , which were ...
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone