Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 35
Page
... Slope protection : Dumped riprap on upstream face ; rockfilled downstream section . Dimensions : Spillway Crest ... slopes , and 70 feet maximum depth below river channel Concrete in cutoff wall : 925 cubic yards Location : East and ...
... Slope protection : Dumped riprap on upstream face ; rockfilled downstream section . Dimensions : Spillway Crest ... slopes , and 70 feet maximum depth below river channel Concrete in cutoff wall : 925 cubic yards Location : East and ...
Page i
... Slope protection ( d ) Design details 11. Stability studies PART II -- DESIGN CHAPTER II -- EARTH DAM ( a ) The slip - circle analysis ( b ) The inclined plane analysis ( c ) Conclusion 12. Test apparatus 13. Field control Page 1 1 1 1 ...
... Slope protection ( d ) Design details 11. Stability studies PART II -- DESIGN CHAPTER II -- EARTH DAM ( a ) The slip - circle analysis ( b ) The inclined plane analysis ( c ) Conclusion 12. Test apparatus 13. Field control Page 1 1 1 1 ...
Page 6
... slope EL 4660 4600 El 4650 EL 4625 100 9 100 SCALE OF FEET 200 300 - : - Rolied embankment riginal ground surface- Concrete cutof ! 8 + 77.94 " EQUATINA " L8 + 87 29 Batter per foen Grout holes 10crs CUTOFF WALL DETAILS 4900 NOTE ...
... slope EL 4660 4600 El 4650 EL 4625 100 9 100 SCALE OF FEET 200 300 - : - Rolied embankment riginal ground surface- Concrete cutof ! 8 + 77.94 " EQUATINA " L8 + 87 29 Batter per foen Grout holes 10crs CUTOFF WALL DETAILS 4900 NOTE ...
Page 8
... slope has a primary upstream slope of 3 to 1 and a downstream slope of 2 to 1. The upstream cofferdam used for diversion is incorporated as a part of the main dam and serves as the upstream toe of the dam . The overflow , ogee - weir ...
... slope has a primary upstream slope of 3 to 1 and a downstream slope of 2 to 1. The upstream cofferdam used for diversion is incorporated as a part of the main dam and serves as the upstream toe of the dam . The overflow , ogee - weir ...
Page 11
... slope of 4 to 1 between the berm and the river- bed . The downstream slope is 2 to 1 from the crest to elevation 4650 , 5 to 1 between elevations 4650 and 4625 , and 2 to 1 below elevation 4625 . The embankment consists of a selected ...
... slope of 4 to 1 between the berm and the river- bed . The downstream slope is 2 to 1 from the crest to elevation 4650 , 5 to 1 between elevations 4650 and 4625 , and 2 to 1 below elevation 4625 . The embankment consists of a selected ...
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone