Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 12
Page x
... piezometer installation 2 3 5 6 9 14 20 21 222222 10 General view of trashrack structure , spillway inlet , and diversion tunnel 30 11 Instructions for operation of spillway gates 31 34 12 Plan and sections of spillway 13 Outlet works ...
... piezometer installation 2 3 5 6 9 14 20 21 222222 10 General view of trashrack structure , spillway inlet , and diversion tunnel 30 11 Instructions for operation of spillway gates 31 34 12 Plan and sections of spillway 13 Outlet works ...
Page 19
... piezometers were installed in the embankment and foundation ( fig . 9 ) . Thirty - six of the piezometer tips were installed in a single cross section at station 6 + 75 . Tips No. 1 through 6 are of the foundation type while the ...
... piezometers were installed in the embankment and foundation ( fig . 9 ) . Thirty - six of the piezometer tips were installed in a single cross section at station 6 + 75 . Tips No. 1 through 6 are of the foundation type while the ...
Page 22
... piezometer installation . 200 N 4825 4650- 4675 4700- 4725 50 4775 4800- 4775 4700 & Cutoff french DOI Power Plant LOCATION CHART NO . ELEVATION LOCATION Outlet funnel Sta . 6 + 75 4875 1 4565.0 170 U.S 4850 2 4555.0 80 D.S 103 Sto 7 + ...
... piezometer installation . 200 N 4825 4650- 4675 4700- 4725 50 4775 4800- 4775 4700 & Cutoff french DOI Power Plant LOCATION CHART NO . ELEVATION LOCATION Outlet funnel Sta . 6 + 75 4875 1 4565.0 170 U.S 4850 2 4555.0 80 D.S 103 Sto 7 + ...
Page 95
... Piezometer piping for tests was included with the penstocks . All of the header and penstocks except the powerhouse portions was embedded in concrete . Concrete backfill was placed in the space between the outside of the header and the ...
... Piezometer piping for tests was included with the penstocks . All of the header and penstocks except the powerhouse portions was embedded in concrete . Concrete backfill was placed in the space between the outside of the header and the ...
Page 96
... Piezometer connections 481.0 Flanges 15-0-23 ' - 6 " o E spillway JA -66 " LD . Outlet pipe -Typical stiffener ring spacing for straight sections of 66 " 1.0.and 571 D.pipe outside tunnel . --- S - 0.00000 4 Outlet nozzle- 4-10-042 F ...
... Piezometer connections 481.0 Flanges 15-0-23 ' - 6 " o E spillway JA -66 " LD . Outlet pipe -Typical stiffener ring spacing for straight sections of 66 " 1.0.and 571 D.pipe outside tunnel . --- S - 0.00000 4 Outlet nozzle- 4-10-042 F ...
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone