Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 38
Page viii
... Installation 203 203 CHAPTER XXI -- INSTALLATION OF POWER EQUIPMENT 161. General 162. Embedded turbine parts ( a ) Draft tube liners ( b ) Spiral casing and pit liner 204 204 204 204 Section TABLE OF CONTENTS ( Continued ) Page A. Work ...
... Installation 203 203 CHAPTER XXI -- INSTALLATION OF POWER EQUIPMENT 161. General 162. Embedded turbine parts ( a ) Draft tube liners ( b ) Spiral casing and pit liner 204 204 204 204 Section TABLE OF CONTENTS ( Continued ) Page A. Work ...
Page ix
... Embedded materials 177. Transportation and placement 178 . 217 219 219 222 222 APPENDIX А Cost summary of Boysen Dam and Powerplant ABCD Construction costs by pay items --Specifications No. 1890 Construction costs by pay items ...
... Embedded materials 177. Transportation and placement 178 . 217 219 219 222 222 APPENDIX А Cost summary of Boysen Dam and Powerplant ABCD Construction costs by pay items --Specifications No. 1890 Construction costs by pay items ...
Page xii
... Embedded metal parts for turbines 205 78 Wickets and turbine shaft in place prior to installation of turbine cover 207 79 Smoothing the laminations for the rotor of generator No. 2 207 80 View of winding in stator of generator No. 2 209 ...
... Embedded metal parts for turbines 205 78 Wickets and turbine shaft in place prior to installation of turbine cover 207 79 Smoothing the laminations for the rotor of generator No. 2 207 80 View of winding in stator of generator No. 2 209 ...
Page 26
... embedded in the concrete of the tunnel lining . The backfill grout used was a mix of 1 cubic foot of sand , 1 cubic foot of cement , and 1 cubic foot of water . This material was pumped into the overbreak at pressures of from 10 to 12 ...
... embedded in the concrete of the tunnel lining . The backfill grout used was a mix of 1 cubic foot of sand , 1 cubic foot of cement , and 1 cubic foot of water . This material was pumped into the overbreak at pressures of from 10 to 12 ...
Page 34
... · 5.002 Sewer pipe drain embedded in gravel Line of joint ' FINAL INSTALLATION GROUTING OUTLET DETAIL Figure 12. --Plan and sections of spillway . From drawing 285 - D - 119 . It was proposed to control or limit to 20 , 34.
... · 5.002 Sewer pipe drain embedded in gravel Line of joint ' FINAL INSTALLATION GROUTING OUTLET DETAIL Figure 12. --Plan and sections of spillway . From drawing 285 - D - 119 . It was proposed to control or limit to 20 , 34.
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone