Boysen Dam and Powerplant: Constructed 1947-19521957 - Boysen Dam - 266 pages |
From inside the book
Results 1-5 of 47
Page
... contract administration and Part IV to construction operations . This technical record was prepared in the Commissioner's Office , Denver , under the direction of the Assistant Commissioner and Chief Engineer . Acknowledgment is ...
... contract administration and Part IV to construction operations . This technical record was prepared in the Commissioner's Office , Denver , under the direction of the Assistant Commissioner and Chief Engineer . Acknowledgment is ...
Page vi
... CONTRACT ADMINISTRATION CHAPTER XI -- MAJOR CONSTRUCTION CONTRACTS 85. Prime contract -- Specifications No. 1890 143 ( a ) Orders for changes 143 ( b ) Extra work orders ( d ) Findings of facts 86. Completion contract -- Specifications ...
... CONTRACT ADMINISTRATION CHAPTER XI -- MAJOR CONSTRUCTION CONTRACTS 85. Prime contract -- Specifications No. 1890 143 ( a ) Orders for changes 143 ( b ) Extra work orders ( d ) Findings of facts 86. Completion contract -- Specifications ...
Page vii
... contracts CHAPTER XIV --GOVERNMENT AND CONTRACTORS ' ORGANIZATIONS 156 156 A. Government Organization 113. General 114 . Government wage - hour forces 115. Safety of Government forces 116. Government camp and housing 161 161 161 162 B ...
... contracts CHAPTER XIV --GOVERNMENT AND CONTRACTORS ' ORGANIZATIONS 156 156 A. Government Organization 113. General 114 . Government wage - hour forces 115. Safety of Government forces 116. Government camp and housing 161 161 161 162 B ...
Page ix
... Contract 163. General 164. Nonembedded parts of turbines ( a ) Turbine erection 165. Generators 206 206 206 208 ( a ) Rotor assembly ( b ) Stators ( c ) Rotor installation 208 208 208 166 . 167 . ( d ) Thrust bearings and guide bearings ...
... Contract 163. General 164. Nonembedded parts of turbines ( a ) Turbine erection 165. Generators 206 206 206 208 ( a ) Rotor assembly ( b ) Stators ( c ) Rotor installation 208 208 208 166 . 167 . ( d ) Thrust bearings and guide bearings ...
Page 10
... contracts Supply contracts Direct Costs $ 575,288 676,896 21,924,685 Short form contracts Purchase orders Labor by Government forces 2,577,531 1,553 , 941 1,264,529 66,562 577,092 Service facilities Total direct costs Indirect Costs ...
... contracts Supply contracts Direct Costs $ 575,288 676,896 21,924,685 Short form contracts Purchase orders Labor by Government forces 2,577,531 1,553 , 941 1,264,529 66,562 577,092 Service facilities Total direct costs Indirect Costs ...
Contents
147 | |
153 | |
156 | |
161 | |
162 | |
164 | |
164 | |
165 | |
60 | |
66 | |
73 | |
79 | |
88 | |
95 | |
101 | |
111 | |
114 | |
122 | |
128 | |
136 | |
143 | |
170 | |
172 | |
173 | |
175 | |
177 | |
180 | |
189 | |
195 | |
203 | |
203 | |
211 | |
233 | |
Common terms and phrases
000 second-feet acre-feet anchor axis backfill Bighorn River Boysen Dam Boysen Powerplant Boysen Reservoir Brass breakers bridge Bronze bulkhead gate channel circuit circuit breakers compressor concrete construction contractor copper crest cubic foot deck designed diorite discharge diversion tunnel downstream draft tube drawing embankment equipment excavation flood foundation gate structure girders Government camp Gray iron Gros Ventre grout grout holes header hoist holes were drilled hydraulic inlet wall installed leaf left abutment load located material maximum normal operating outlet pipe penstock percent pier piezometer pounds per square powerhouse pressure pump radial gates railroad tunnel reinforced relocated reservoir water reservoir water surface right abutment ring RING SEAL riprap river rock roof sandstone SCALE OF FEET seal SECTION SHOSHONI side slope spillway square inch steel stilling basin storage surge tank switchyard tailwater tank Thermopolis transformer trashrack structure turbine unit upstream valve vertical zone