Platoro Dam: Constructed 1949-1951 |
From inside the book
Page ii
Field force ( a ) Survey unit ( b ) Inspection unit ( c ) Laboratory unit 39 .
Government wage - hour forces E . Contractor ' s Organization 40 . Prime
contractor 41 . Minor contractors 42 . Employment - 43 . Safety F . Access Roads
and Bridge 44 .
Field force ( a ) Survey unit ( b ) Inspection unit ( c ) Laboratory unit 39 .
Government wage - hour forces E . Contractor ' s Organization 40 . Prime
contractor 41 . Minor contractors 42 . Employment - 43 . Safety F . Access Roads
and Bridge 44 .
Page 25
( c ) Control Unit . - - Each valve has an individual control unit which is located
above the valve on the floor of the operating chamber . The unit consists of a
stand supporting a limit - torque reversible electric motor and a handwheel ,
either of ...
( c ) Control Unit . - - Each valve has an individual control unit which is located
above the valve on the floor of the operating chamber . The unit consists of a
stand supporting a limit - torque reversible electric motor and a handwheel ,
either of ...
Page 31
38 . Field Force . - All field personnel were under the direction of the field
engineer , who supervised activities of the survey , inspection , and laboratory
units . ( a ) Survey Unit . - - The survey unit was headed by a chief of surveys ,
who had four ...
38 . Field Force . - All field personnel were under the direction of the field
engineer , who supervised activities of the survey , inspection , and laboratory
units . ( a ) Survey Unit . - - The survey unit was headed by a chief of surveys ,
who had four ...
Page 32
The inspection unit was under the supervision of a chief inspector and consisted
of three civil engineers , five construction inspectors ... During peak construction
periods , additional personnel were furnished by the laboratory and survey units .
The inspection unit was under the supervision of a chief inspector and consisted
of three civil engineers , five construction inspectors ... During peak construction
periods , additional personnel were furnished by the laboratory and survey units .
Page 66
Property and pay item description Labor and materials Quantity furnished by
contractor Amount Unit Unit cost Total cost Diversion of river Lump sum 30 , 000 .
00 Excavation , common , outlet works 1 , 202 cu . yd . 2 . 00 2 , 404 . 00
Excavation ...
Property and pay item description Labor and materials Quantity furnished by
contractor Amount Unit Unit cost Total cost Diversion of river Lump sum 30 , 000 .
00 Excavation , common , outlet works 1 , 202 cu . yd . 2 . 00 2 , 404 . 00
Excavation ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
abutment additional approximately August axis borrow area bridge bronze butterfly valves changes channel clearing compaction completed concrete conduit Conejos River consisted construction contract contractor cost crest cubic delays dike directed discharge diversion downstream drain drilling elevation embankment engineer equipment excavation fault feet field Figure flow force foundation furnished gate chamber Government gravel grout cap head high-pressure holes impervious inches included initiated inspection installation joints July June laboratory load located machine material maximum means Metal necessary noted November obtained opening operations Original outlet pipe outlet tunnel painting percent performed placed placement PLAN plant plates Platoro Dam pressure reservoir riprap river road rock ROCK BORROW AREA season separation September slide rock slope specifications spillway stage station steel structure surface tests trashrack trench trucks tunnel unit upstream valve house wall zone
Popular passages
Page 16 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 20 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 20 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...