Platoro Dam: Constructed 1949-1951 |
From inside the book
Page 22
... and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases , "
1943 edition , unless otherwise noted . In order to provide adequate rigidity for
fabrication and handling , and resistance to vibration and corrosion during
operation ...
... and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases , "
1943 edition , unless otherwise noted . In order to provide adequate rigidity for
fabrication and handling , and resistance to vibration and corrosion during
operation ...
Page 23
As previously noted , the valve chamber near the axis of Platoro Dam houses a 4
- by 5 - foot high - pressure gate ( fig . 10 ) . This gate is used only for emergency
closure or to permit unwatering and necessary inspection and maintenance of ...
As previously noted , the valve chamber near the axis of Platoro Dam houses a 4
- by 5 - foot high - pressure gate ( fig . 10 ) . This gate is used only for emergency
closure or to permit unwatering and necessary inspection and maintenance of ...
Page 37
Clearing of the reservoir area was accomplished by separate contract , as noted
in section 32 . The severe climatic conditions at the site restricted clearing and all
construction activities to about a six - month period from May to November each ...
Clearing of the reservoir area was accomplished by separate contract , as noted
in section 32 . The severe climatic conditions at the site restricted clearing and all
construction activities to about a six - month period from May to November each ...
Page 52
No special problems were encountered in the grouting process and no special
levels noted where grout acceptance was either generally high or low . The
maximum quantity of grout taken by any hole was pumped into a 55 - foot hole at
...
No special problems were encountered in the grouting process and no special
levels noted where grout acceptance was either generally high or low . The
maximum quantity of grout taken by any hole was pumped into a 55 - foot hole at
...
Page 60
This phase of the work was under rigid control and was suspended twice during
the course of clearing , as previously noted . As there were 18 days allowable
time remaining at the time of completion of the contract , no time extension was ...
This phase of the work was under rigid control and was suspended twice during
the course of clearing , as previously noted . As there were 18 days allowable
time remaining at the time of completion of the contract , no time extension was ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
abutment additional approximately August axis borrow area bridge bronze butterfly valves changes channel clearing compaction completed concrete conduit Conejos River consisted construction contract contractor cost crest cubic delays dike directed discharge diversion downstream drain drilling elevation embankment engineer equipment excavation fault feet field Figure flow force foundation furnished gate chamber Government gravel grout cap head high-pressure holes impervious inches included initiated inspection installation joints July June laboratory load located machine material maximum means Metal necessary noted November obtained opening operations Original outlet pipe outlet tunnel painting percent performed placed placement PLAN plant plates Platoro Dam pressure reservoir riprap river road rock ROCK BORROW AREA season separation September slide rock slope specifications spillway stage station steel structure surface tests trashrack trench trucks tunnel unit upstream valve house wall zone
Popular passages
Page 16 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 20 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 20 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...