Platoro Dam: Constructed 1949-1951 |
From inside the book
Page 12
As a means of reducing the effective moisture content the contractor was
permitted to increase the spacing of the bars in his separation plant to produce
zone 1 material with maximum - size rocks of 5 inches instead of 3 inches 3 ) .
Increasing ...
As a means of reducing the effective moisture content the contractor was
permitted to increase the spacing of the bars in his separation plant to produce
zone 1 material with maximum - size rocks of 5 inches instead of 3 inches 3 ) .
Increasing ...
Page 14
Oct Nov Dec MEAN DAILY DISCHARGE IN MUNDREDS OF CUBIC FEET PER
SECOND 1946 19 38 June July MEAN DAILY DISCHARGE IN HUNDREDS OF
CUBIC FEET PER SECOND 19 42 June July LE Mar Apr May Aug ESADO Nov ...
Oct Nov Dec MEAN DAILY DISCHARGE IN MUNDREDS OF CUBIC FEET PER
SECOND 1946 19 38 June July MEAN DAILY DISCHARGE IN HUNDREDS OF
CUBIC FEET PER SECOND 19 42 June July LE Mar Apr May Aug ESADO Nov ...
Page 20
At the downstream end the pipe is bifurcated by means of a wye into two 48 - inch
branches each of which is controlled by a 48 - inch butterfly valve bolted to the
steel flange of the pipe . The wye is completely embedded in the concrete of the ...
At the downstream end the pipe is bifurcated by means of a wye into two 48 - inch
branches each of which is controlled by a 48 - inch butterfly valve bolted to the
steel flange of the pipe . The wye is completely embedded in the concrete of the ...
Page 37
Trees were felled by means of two - man cross - cut saws and small gasoline -
driven chain saws ; stumps were removed by means of a bulldozer and the brush
, logs , and stumps were burned . Clearing of borrow areas 2 , 16 , and 13 was ...
Trees were felled by means of two - man cross - cut saws and small gasoline -
driven chain saws ; stumps were removed by means of a bulldozer and the brush
, logs , and stumps were burned . Clearing of borrow areas 2 , 16 , and 13 was ...
Page 53
Batching of concrete aggregates was accomplished by means of a batch plant
equipped with three storage bins , a sliding weighing hopper , and 3 - beam
scales . Aggregates were conveyed from stockpiles to the storage bins by the use
of a ...
Batching of concrete aggregates was accomplished by means of a batch plant
equipped with three storage bins , a sliding weighing hopper , and 3 - beam
scales . Aggregates were conveyed from stockpiles to the storage bins by the use
of a ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
abutment additional approximately August axis borrow area bridge bronze butterfly valves changes channel clearing compaction completed concrete conduit Conejos River consisted construction contract contractor cost crest cubic delays dike directed discharge diversion downstream drain drilling elevation embankment engineer equipment excavation fault feet field Figure flow force foundation furnished gate chamber Government gravel grout cap head high-pressure holes impervious inches included initiated inspection installation joints July June laboratory load located machine material maximum means Metal necessary noted November obtained opening operations Original outlet pipe outlet tunnel painting percent performed placed placement PLAN plant plates Platoro Dam pressure reservoir riprap river road rock ROCK BORROW AREA season separation September slide rock slope specifications spillway stage station steel structure surface tests trashrack trench trucks tunnel unit upstream valve house wall zone
Popular passages
Page 16 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 20 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 20 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...