glacial till material was moderately compressible . Additional stability studies
were made based on placement conditions approaching laboratory optimum .
These studies indicated that construction pore pressure of serious magnitude
might ...
glacial till material was moderately compressible . Additional stability studies
were made based on placement conditions approaching laboratory optimum .
These studies indicated that construction pore pressure of serious magnitude
might ...
Page 44
Three borrow areas were considered for impervious ( zone 1 ) material ( fig . 19 )
. These included borrow area 6 , located about 1 mile northwest of the dam site
and 500 feet above the design crest elevation ; an extension of borrow area 6 ...
Three borrow areas were considered for impervious ( zone 1 ) material ( fig . 19 )
. These included borrow area 6 , located about 1 mile northwest of the dam site
and 500 feet above the design crest elevation ; an extension of borrow area 6 ...
Page 48
Placing was resumed in June 1950 , with the first zone 1 material being tamped
in the dike section June 20 . Operations were extremely slow during July as the
material was at or above optimum moisture content and there were continual ...
Placing was resumed in June 1950 , with the first zone 1 material being tamped
in the dike section June 20 . Operations were extremely slow during July as the
material was at or above optimum moisture content and there were continual ...
Page 50
Material used was from the same source as the remainder of zone 1 . After
dumping , the material was shoveled into place by hand and larger rocks
removed so that mechanical tampers could obtain the desired results . A total of 1
, 643 cubic ...
Material used was from the same source as the remainder of zone 1 . After
dumping , the material was shoveled into place by hand and larger rocks
removed so that mechanical tampers could obtain the desired results . A total of 1
, 643 cubic ...
Page 51
Material used was from the same source as the remainder of zone 1 . After
dumping , the material was shoveled into place by hand and larger rocks
removed so that mechanical tampers could obtain the desired results . A total of 1
, 643 cubic ...
Material used was from the same source as the remainder of zone 1 . After
dumping , the material was shoveled into place by hand and larger rocks
removed so that mechanical tampers could obtain the desired results . A total of 1
, 643 cubic ...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
abutment additional approximately August axis borrow area bridge bronze butterfly valves changes channel clearing compaction completed concrete conduit Conejos River consisted construction contract contractor cost crest cubic delays dike directed discharge diversion downstream drain drilling elevation embankment engineer equipment excavation fault feet field Figure flow force foundation furnished gate chamber Government gravel grout cap head high-pressure holes impervious inches included initiated inspection installation joints July June laboratory load located machine material maximum means Metal necessary noted November obtained opening operations Original outlet pipe outlet tunnel painting percent performed placed placement PLAN plant plates Platoro Dam pressure reservoir riprap river road rock ROCK BORROW AREA season separation September slide rock slope specifications spillway stage station steel structure surface tests trashrack trench trucks tunnel unit upstream valve house wall zone
Popular passages
Page 16 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 20 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 20 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...