The outlet conduit extends from the trashrack to the inlet tunnel portal and has an
inside diameter of 6 feet 6 inches , the same as the tunnel to which it connects . At
station 7 + 24 the tunnel connects with the gate chamber which houses a 4 ...
The outlet conduit extends from the trashrack to the inlet tunnel portal and has an
inside diameter of 6 feet 6 inches , the same as the tunnel to which it connects . At
station 7 + 24 the tunnel connects with the gate chamber which houses a 4 ...
Page 17
000 It Ax Oo 0020 SECTION A - A SECTION 0 - 0 CONDUIT SECTION 3 . ...
electrical conduits and apparatus , reservoir level goge ond piping , high
pressure pote control piping and apparatus , ond gote chamber wentlating
system Pipe or ...
000 It Ax Oo 0020 SECTION A - A SECTION 0 - 0 CONDUIT SECTION 3 . ...
electrical conduits and apparatus , reservoir level goge ond piping , high
pressure pote control piping and apparatus , ond gote chamber wentlating
system Pipe or ...
Page 56
Trashrack and Conduit Section . - The trashrack proper and the transition to the
conduit section were placed September 27 to October 24 , 1949 , during slack
periods in tunnel lining operations . Placement in this portion of the structure was
...
Trashrack and Conduit Section . - The trashrack proper and the transition to the
conduit section were placed September 27 to October 24 , 1949 , during slack
periods in tunnel lining operations . Placement in this portion of the structure was
...
Page 68
Pay item Property and pay item description Labor and materials Materials
Quantity furnished by contractor furnished by Amount Unit Unit costs Total cost
Government Total cost 2 4 5 Furnish and install electrical conduit 1 - 1 / 4 inches
682 .
Pay item Property and pay item description Labor and materials Materials
Quantity furnished by contractor furnished by Amount Unit Unit costs Total cost
Government Total cost 2 4 5 Furnish and install electrical conduit 1 - 1 / 4 inches
682 .
Page 69
... Pressure Gate - - Conduit Lining 40 - D - 4689 - - Standard Design - - 4 - by 5 -
Foot High - Pressure Gate - - Conduit Lining - - Transition 40 - D - 3595 - - High -
Pressure Gate - - 4 - Foot 0 - Inch Cover for 110 , 000 - Pound Hydraulic Hoist 40
...
... Pressure Gate - - Conduit Lining 40 - D - 4689 - - Standard Design - - 4 - by 5 -
Foot High - Pressure Gate - - Conduit Lining - - Transition 40 - D - 3595 - - High -
Pressure Gate - - 4 - Foot 0 - Inch Cover for 110 , 000 - Pound Hydraulic Hoist 40
...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Common terms and phrases
abutment additional approximately August axis borrow area bridge bronze butterfly valves changes channel clearing compaction completed concrete conduit Conejos River consisted construction contract contractor cost crest cubic delays dike directed discharge diversion downstream drain drilling elevation embankment engineer equipment excavation fault feet field Figure flow force foundation furnished gate chamber Government gravel grout cap head high-pressure holes impervious inches included initiated inspection installation joints July June laboratory load located machine material maximum means Metal necessary noted November obtained opening operations Original outlet pipe outlet tunnel painting percent performed placed placement PLAN plant plates Platoro Dam pressure reservoir riprap river road rock ROCK BORROW AREA season separation September slide rock slope specifications spillway stage station steel structure surface tests trashrack trench trucks tunnel unit upstream valve house wall zone
Popular passages
Page 16 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 20 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 20 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...