Page 10
... season , the borrow area was found to contain moisture in excess of the upper limit of the desirable placement range . Although it contained considerable rock , the --E1 10,048 O RIPRAD 27,000 CY .-— MAXIMUM < --- 10.
... season , the borrow area was found to contain moisture in excess of the upper limit of the desirable placement range . Although it contained considerable rock , the --E1 10,048 O RIPRAD 27,000 CY .-— MAXIMUM < --- 10.
Page 12
... season in 1950 resulted in a mean placement moisture content near the laboratory optimum condition . At the start of construction , fill densities of the minus No. 4 fraction of the impervious material were high . However , with the ...
... season in 1950 resulted in a mean placement moisture content near the laboratory optimum condition . At the start of construction , fill densities of the minus No. 4 fraction of the impervious material were high . However , with the ...
Page 13
... season , October 15 through March 31. Continuous flow for fish preservation was not required . The size of any feature of the outlet works was not determined by the diversion requirements . The actual diversion operations are discussed ...
... season , October 15 through March 31. Continuous flow for fish preservation was not required . The size of any feature of the outlet works was not determined by the diversion requirements . The actual diversion operations are discussed ...
Page 32
... season , and embankment operations were performed during 1950 and 1951 in conjunction with the completion of drilling and grouting and inter- mittent concrete operations in the valve house , grout cap , and spillway bridge . For this ...
... season , and embankment operations were performed during 1950 and 1951 in conjunction with the completion of drilling and grouting and inter- mittent concrete operations in the valve house , grout cap , and spillway bridge . For this ...
Page 33
... season the organization was adequately staffed . The common labor supply was always adequate . E. Contractor's Organization 40. Prime Contractor . - Operations of the Hinman Construction Company , prime contractor ( specifications No ...
... season the organization was adequately staffed . The common labor supply was always adequate . E. Contractor's Organization 40. Prime Contractor . - Operations of the Hinman Construction Company , prime contractor ( specifications No ...
Common terms and phrases
5-Foot High-Pressure acre-feet andesite Bolt bulldozed butterfly valves channel cofferdam completed conduit Conejos River contract cost cubic feet cubic yards cutoff trench dam and dike dam embankment dam foundation Denver dike section discharge drain emergency gate end-dump trucks engineer equipment excavation fault feet per second Figure fill zone flange flow fractured gate chamber Government camp grout cap Grout holes haul high-pressure gate impervious material inches inlet installation joints July Aug Sept June 21 laboratory leaf-Class left abutment load located main dam maximum Metal metalwork mixer moisture Order for changes outlet pipe outlet tunnel PARTIAL RUNOFF percent placed placement plates Platoro Dam pumpcrete machine reservoir right abutment Rio Grande Compact RIO GRANDE COUNTY riprap ROCK BORROW AREA rockfill SAN LUIS VALLEY separation plant SLIDE ROCK BORROW specifications spillway bridge steel pipe support rings talus tests trashrack structure unit valve house zone 1 material
Popular passages
Page 18 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 22 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 22 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...