... performed , as the few unhealed or open fractures were found to be generally clean and free from mud or other disintegrated material . Whether or not the visible faulted or mineralized zones will in the future transmit appreciable ...
... performed , as the few unhealed or open fractures were found to be generally clean and free from mud or other disintegrated material . Whether or not the visible faulted or mineralized zones will in the future transmit appreciable ...
Page 3
... performed , as the few unhealed or open fractures were found to be generally clean and free from mud or other disintegrated material . Whether or not the visible faulted or mineralized zones will in the future transmit appreciable ...
... performed , as the few unhealed or open fractures were found to be generally clean and free from mud or other disintegrated material . Whether or not the visible faulted or mineralized zones will in the future transmit appreciable ...
Page 5
... performed 6 / . Initial excavation of a slide rock area produced a material of questionable permeability because of an excess of fines . A sample of this material was submitted to the Denver laboratories for permeability tests 24 / . 1 ...
... performed 6 / . Initial excavation of a slide rock area produced a material of questionable permeability because of an excess of fines . A sample of this material was submitted to the Denver laboratories for permeability tests 24 / . 1 ...
Page 6
... performed under specifications No. 2594 is given in appendix A. Direct Costs Contract Payments Earthfill dam and dike and appurtenant works ( specs . No. 2594 ) Clearing reservoir below elevation 10 , 054 ( specs . No. R5-13 ) Various ...
... performed under specifications No. 2594 is given in appendix A. Direct Costs Contract Payments Earthfill dam and dike and appurtenant works ( specs . No. 2594 ) Clearing reservoir below elevation 10 , 054 ( specs . No. R5-13 ) Various ...
Page 12
... performed in the rockfill and riprap portions of the embankment . Visual inspection of these zones was relied upon for proper gradation and placement of these materials in accordance with the specifications . - 17. Field Modifications ...
... performed in the rockfill and riprap portions of the embankment . Visual inspection of these zones was relied upon for proper gradation and placement of these materials in accordance with the specifications . - 17. Field Modifications ...
Common terms and phrases
5-Foot High-Pressure acre-feet andesite Bolt bulldozed butterfly valves channel cofferdam completed conduit Conejos River contract cost cubic feet cubic yards cutoff trench dam and dike dam embankment dam foundation Denver dike section discharge drain emergency gate end-dump trucks engineer equipment excavation fault feet per second Figure fill zone flange flow fractured gate chamber Government camp grout cap Grout holes haul high-pressure gate impervious material inches inlet installation joints July Aug Sept June 21 laboratory leaf-Class left abutment load located main dam maximum Metal metalwork mixer moisture Order for changes outlet pipe outlet tunnel PARTIAL RUNOFF percent placed placement plates Platoro Dam pumpcrete machine reservoir right abutment Rio Grande Compact RIO GRANDE COUNTY riprap ROCK BORROW AREA rockfill SAN LUIS VALLEY separation plant SLIDE ROCK BORROW specifications spillway bridge steel pipe support rings talus tests trashrack structure unit valve house zone 1 material
Popular passages
Page 18 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 22 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 22 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...