Platoro Dam: Constructed 1949-19511954 - Dams - 71 pages |
From inside the book
Results 1-5 of 10
Page ii
... Inspection unit ( c ) Laboratory unit 39 . Government wage - hour forces D. Government Organization 36 . General 37 . 38 . Administrative and office engineering forces Field force ( a ) Survey unit 31 31 31 31 32 32 32 Contractor's ...
... Inspection unit ( c ) Laboratory unit 39 . Government wage - hour forces D. Government Organization 36 . General 37 . 38 . Administrative and office engineering forces Field force ( a ) Survey unit 31 31 31 31 32 32 32 Contractor's ...
Page 12
... inspection of these zones was relied upon for proper gradation and placement of these materials in accordance with the specifications . - 17. Field Modifications . To improve the stability of the placed material ( and inci- dentally ...
... inspection of these zones was relied upon for proper gradation and placement of these materials in accordance with the specifications . - 17. Field Modifications . To improve the stability of the placed material ( and inci- dentally ...
Page 13
... inspection ( fig . 32 ) . The bridge is designed for an H - 20 truck load and was placed such that its width may be increased easily at a later date if desired . 19. Diversion Plan . - During construction of the outlet tunnel the river ...
... inspection ( fig . 32 ) . The bridge is designed for an H - 20 truck load and was placed such that its width may be increased easily at a later date if desired . 19. Diversion Plan . - During construction of the outlet tunnel the river ...
Page 20
... inspection or mainte- nance work . The ventilation system consists of a fan mounted on a wall bracket in the valve house , and 8 - inch - diameter slip - joint duct leading from the fan in the valve house through the tunnel to the gate ...
... inspection or mainte- nance work . The ventilation system consists of a fan mounted on a wall bracket in the valve house , and 8 - inch - diameter slip - joint duct leading from the fan in the valve house through the tunnel to the gate ...
Page 22
... Inspection , and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases , " 1943 edition , unless otherwise noted . In order to provide adequate rigidity for fabrication and handling , and resistance to vibration and ...
... Inspection , and Repair of Unfired Pressure Vessels for Petroleum Liquids and Gases , " 1943 edition , unless otherwise noted . In order to provide adequate rigidity for fabrication and handling , and resistance to vibration and ...
Common terms and phrases
48-inch butterfly valves acre-feet andesite axis Bolt bulldozed butterfly valves cofferdam completed Concrete grout conduit Conejos River contract cost cubic feet cubic yards cutoff trench dam and dike dam embankment dam foundation dike section discharge drain emergency gate end-dump trucks engineer equipment excavation fault fault gouge feet per second Figure fill zone flange flow fractured gate chamber Government camp grout cap Grout holes haul impervious material inches installation joints July Aug Sept June 21 laboratory leaf-Class left abutment load located main dam maximum Metal metalwork mixer moisture Order for changes outlet pipe outlet tunnel PARTIAL RUNOFF percent placed placement plates Platoro Dam pounds per square pumpcrete machine right abutment Rio Grande Compact RIO GRANDE COUNTY riprap ROCK BORROW AREA rockfill SAN LUIS VALLEY separation plant SLIDE ROCK BORROW specifications spillway bridge support rings talus tests trashrack structure unit valve house zone 1 material
Popular passages
Page 18 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 22 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 22 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...