Platoro Dam: Constructed 1949-19511954 - Dams - 71 pages |
From inside the book
Results 1-5 of 18
Page i
... Cost summary 7. Special problems 8. General CHAPTER II -- DESIGN Page 3 3 3 5 6 111333566 7 A. Earth Dam -7 7 10 10 10 10 10 * 10 12 12 12 12 12 12 9. Detailed description 10 . Foundation design 11. Specification zoning 12. Embankment ...
... Cost summary 7. Special problems 8. General CHAPTER II -- DESIGN Page 3 3 3 5 6 111333566 7 A. Earth Dam -7 7 10 10 10 10 10 * 10 12 12 12 12 12 12 9. Detailed description 10 . Foundation design 11. Specification zoning 12. Embankment ...
Page iv
... APPENDIXES A. Breakdown of cost by pay items for specifications No. 2594-- Platoro Dam B. List of specification drawings for Platoro Dam C. References 66 69 71 Figure Frontispiece 1. Platoro Dam location map 2. Geologic map iv.
... APPENDIXES A. Breakdown of cost by pay items for specifications No. 2594-- Platoro Dam B. List of specification drawings for Platoro Dam C. References 66 69 71 Figure Frontispiece 1. Platoro Dam location map 2. Geologic map iv.
Page vii
... cost studies had determined that , in view of current construction cost , Platoro Dam , with a capacity of 60,000 acre - feet , was the only feature of the proj- ect that could be economically justified 5 / . Accordingly , designs and ...
... cost studies had determined that , in view of current construction cost , Platoro Dam , with a capacity of 60,000 acre - feet , was the only feature of the proj- ect that could be economically justified 5 / . Accordingly , designs and ...
Page 5
... produced a material of questionable permeability because of an excess of fines . A sample of this material was submitted to the Denver laboratories for permeability tests 24 / . 1 / 6. Cost Summary.- Platoro Dam was constructed in 5.
... produced a material of questionable permeability because of an excess of fines . A sample of this material was submitted to the Denver laboratories for permeability tests 24 / . 1 / 6. Cost Summary.- Platoro Dam was constructed in 5.
Page 6
Constructed 1949-1951 United States. Bureau of Reclamation. 1 / 6. Cost Summary.- Platoro Dam was constructed in ... cost by pay items for work performed under specifications No. 2594 is given in appendix A. Direct Costs Contract ...
Constructed 1949-1951 United States. Bureau of Reclamation. 1 / 6. Cost Summary.- Platoro Dam was constructed in ... cost by pay items for work performed under specifications No. 2594 is given in appendix A. Direct Costs Contract ...
Common terms and phrases
48-inch butterfly valves acre-feet andesite axis Bolt bulldozed butterfly valves cofferdam completed Concrete grout conduit Conejos River contract cost cubic feet cubic yards cutoff trench dam and dike dam embankment dam foundation dike section discharge drain emergency gate end-dump trucks engineer equipment excavation fault fault gouge feet per second Figure fill zone flange flow fractured gate chamber Government camp grout cap Grout holes haul impervious material inches installation joints July Aug Sept June 21 laboratory leaf-Class left abutment load located main dam maximum Metal metalwork mixer moisture Order for changes outlet pipe outlet tunnel PARTIAL RUNOFF percent placed placement plates Platoro Dam pounds per square pumpcrete machine right abutment Rio Grande Compact RIO GRANDE COUNTY riprap ROCK BORROW AREA rockfill SAN LUIS VALLEY separation plant SLIDE ROCK BORROW specifications spillway bridge support rings talus tests trashrack structure unit valve house zone 1 material
Popular passages
Page 18 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 22 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 22 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...