... Original ground surface Original ground surface , Talus and soil- Grout holes @ 10,025 CONEJOS RIVER Talus O PROFILE ALONG OF AXIS OF DAM ELEVATION 5 Min 5-3 " Av Grout holes @ approx . E. 99,000 --Axis of dike 20 3 Riprap Remove humus ...
... Original ground surface Original ground surface , Talus and soil- Grout holes @ 10,025 CONEJOS RIVER Talus O PROFILE ALONG OF AXIS OF DAM ELEVATION 5 Min 5-3 " Av Grout holes @ approx . E. 99,000 --Axis of dike 20 3 Riprap Remove humus ...
Page 9
... Original ground surface- Assumed rock surface 12 " Drain · -200 ' -- F2 Finish MAXIMUM SECTION TYPICAL ZONING RIGHT OF SPILLWAY C.I. Pipe drains I --Concrete pier 12 " DRAIN -3 " Crown Crest El . 10,048.0 Max . W. S. El 10,042.0 EL ...
... Original ground surface- Assumed rock surface 12 " Drain · -200 ' -- F2 Finish MAXIMUM SECTION TYPICAL ZONING RIGHT OF SPILLWAY C.I. Pipe drains I --Concrete pier 12 " DRAIN -3 " Crown Crest El . 10,048.0 Max . W. S. El 10,042.0 EL ...
Page 10
... Original designs included toe drain in the downstream rock toe below elevation 10,025 . On reviewing the preinvitation design , it was noted that the topography of the foundation area was such that it would contain and direct seepage ...
... Original designs included toe drain in the downstream rock toe below elevation 10,025 . On reviewing the preinvitation design , it was noted that the topography of the foundation area was such that it would contain and direct seepage ...
Page 12
... original elevations , and their elevations two years later , are shown in the following tabulation : Elevation on August 11 , 1953 Marker at station Original elevation , August 30 , 1951 3 + 00 10,048.96 10,048.85 5 + 34.98 10,049.29 ...
... original elevations , and their elevations two years later , are shown in the following tabulation : Elevation on August 11 , 1953 Marker at station Original elevation , August 30 , 1951 3 + 00 10,048.96 10,048.85 5 + 34.98 10,049.29 ...
Page 17
... Original ground line EL 9900 Construction joint . Side slopes · 9900 . 9925 9950 9975 .-- Valve house -56 ° 10 steel pipe € 6 ° HS funnel Invert E19889 . 25 . 2-48 " Butterfly valves Sta 7 + 24 PROFILE ON & TUNNEL Vent hole . Pipe or ...
... Original ground line EL 9900 Construction joint . Side slopes · 9900 . 9925 9950 9975 .-- Valve house -56 ° 10 steel pipe € 6 ° HS funnel Invert E19889 . 25 . 2-48 " Butterfly valves Sta 7 + 24 PROFILE ON & TUNNEL Vent hole . Pipe or ...
Common terms and phrases
48-inch butterfly valves acre-feet andesite axis Bolt bulldozed butterfly valves cofferdam completed Concrete grout conduit Conejos River contract cost cubic feet cubic yards cutoff trench dam and dike dam embankment dam foundation dike section discharge drain emergency gate end-dump trucks engineer equipment excavation fault fault gouge feet per second Figure fill zone flange flow fractured gate chamber Government camp grout cap Grout holes haul impervious material inches installation joints July Aug Sept June 21 laboratory leaf-Class left abutment load located main dam maximum Metal metalwork mixer moisture Order for changes outlet pipe outlet tunnel PARTIAL RUNOFF percent placed placement plates Platoro Dam pounds per square pumpcrete machine right abutment Rio Grande Compact RIO GRANDE COUNTY riprap ROCK BORROW AREA rockfill SAN LUIS VALLEY separation plant SLIDE ROCK BORROW specifications spillway bridge support rings talus tests trashrack structure unit valve house zone 1 material
Popular passages
Page 18 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 22 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 22 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...