Platoro Dam: Constructed 1949-19511954 - Dams - 71 pages |
From inside the book
Results 1-5 of 16
Page ii
... government Page 29 29 - 30 30 30 30 30 30 31 ( b ) Inspection unit ( c ) Laboratory unit 39 . Government wage - hour forces D. Government Organization 36 . General 37 . 38 . Administrative and office engineering forces Field force ( a ) ...
... government Page 29 29 - 30 30 30 30 30 30 31 ( b ) Inspection unit ( c ) Laboratory unit 39 . Government wage - hour forces D. Government Organization 36 . General 37 . 38 . Administrative and office engineering forces Field force ( a ) ...
Page 6
... Government Materials Furnished , " includes gates , valves , outlet pipe , and certain mechanical equipment . A breakdown of cost by pay items for work performed under specifications No. 2594 is given in appendix A. Direct Costs ...
... Government Materials Furnished , " includes gates , valves , outlet pipe , and certain mechanical equipment . A breakdown of cost by pay items for work performed under specifications No. 2594 is given in appendix A. Direct Costs ...
Page 19
... RECLAMATION SAN LUIS VALLEY PROJECT - COLORADO PLATORO DAM OUTLET WORKS STRUCTURES SUBMITTED TOPscener ELEVATION H - H DRAWN LO CLO TRACED VALVE HOUSE RECOMMENDED of Rice withelder Oil piping- furnished by the Government . Air vent 21.
... RECLAMATION SAN LUIS VALLEY PROJECT - COLORADO PLATORO DAM OUTLET WORKS STRUCTURES SUBMITTED TOPscener ELEVATION H - H DRAWN LO CLO TRACED VALVE HOUSE RECOMMENDED of Rice withelder Oil piping- furnished by the Government . Air vent 21.
Page 24
... Government . 38 41 36 33 22.20 13 12 29 62 28 ( 16 Floor level . -Air inlet connection furnished by the Government . Bypass alternate location . Downstream frame Weep holes 16 19 4-0 " ( Height of gate ) 16 18 Downstream-- frame LIST OF ...
... Government . 38 41 36 33 22.20 13 12 29 62 28 ( 16 Floor level . -Air inlet connection furnished by the Government . Bypass alternate location . Downstream frame Weep holes 16 19 4-0 " ( Height of gate ) 16 18 Downstream-- frame LIST OF ...
Page 30
... Government forces . This was necessary because of the late delivery of the butterfly valves and hatch covers furnished by the Government . No adjustment was made in the contract price . 29. Extra Work Orders . - Extra work order No. 1 ...
... Government forces . This was necessary because of the late delivery of the butterfly valves and hatch covers furnished by the Government . No adjustment was made in the contract price . 29. Extra Work Orders . - Extra work order No. 1 ...
Common terms and phrases
48-inch butterfly valves acre-feet andesite axis Bolt bulldozed butterfly valves cofferdam completed Concrete grout conduit Conejos River contract cost cubic feet cubic yards cutoff trench dam and dike dam embankment dam foundation dike section discharge drain emergency gate end-dump trucks engineer equipment excavation fault fault gouge feet per second Figure fill zone flange flow fractured gate chamber Government camp grout cap Grout holes haul impervious material inches installation joints July Aug Sept June 21 laboratory leaf-Class left abutment load located main dam maximum Metal metalwork mixer moisture Order for changes outlet pipe outlet tunnel PARTIAL RUNOFF percent placed placement plates Platoro Dam pounds per square pumpcrete machine right abutment Rio Grande Compact RIO GRANDE COUNTY riprap ROCK BORROW AREA rockfill SAN LUIS VALLEY separation plant SLIDE ROCK BORROW specifications spillway bridge support rings talus tests trashrack structure unit valve house zone 1 material
Popular passages
Page 18 - ... PARTS 151. Character of Structure.— The structure is to be of the skeleton, curtain-beam type, resting on I-beam footings or grillages. The building is to be (18) stories high, with a basement story and a (flat) (mansard) (pointed) (hipped) roof. 152. Floor Loading.— The floors are to be calculated for a live load of (100) pounds per square foot, and a dead load of (50) pounds per square foot. The roof is to be calculated for a live load of (50) pounds per square foot, and a dead load of...
Page 22 - Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Flange and Firebox Qualities (Plates 2 in. and Under in Thickness) (ASTM Designation: A 285),' or Tentative Specifications for Low and Intermediate Tensile Strength Carbon-Steel Plates of Structural Quality (Plates 2 in.
Page 22 - Standard Specifications for FORGED- OR ROLLED-STEEL PIPE FLANGES, FORGED FITTINGS, AND VALVES AND PARTS FOR HIGH-TEMPERATURE SERVICE...