Page images
PDF
EPUB

Specifications No. R5-15

253-5-59

--Platoro Dam--Government Camp--Liquefied Petroleum Gas System

Specifications No. R5-24

253-500-71--Platoro Dam--Gate Tender's Residence--Location Map 253-500-72--Platoro Dam--Gate Tender's Residence--Plan, Elevations and Details 253-500-73--Platoro Dam--Gate Tender's Residence--Details

[blocks in formation]

1 Abdun-Nur, E. A., "Construction Materials Reconnaissance--Platoro Dam, San Luis

Valley Project, Colorado." Field Trip Report No. 142*, U.S. Bureau of Reclamation, August 14, 1946.

2

Adolphson, J. W., "Inspection of 48-Inch Butterfly Valves for Outlet Works --Platoro Dam, San Luis Valley Project. Field Trip Report*, U.S. Bureau of Reclamation, June 18, 1952.

Field Trip

Hilf, J. W., "Inspection of Platoro Dam, San Luis Valley Project.
Report*, U.S. Bureau of Reclamation, September 8, 1950.

4 Werner, A. W., "Supplemental Report on Preliminary Design and Estimates for

Wagon Wheel Gap, Conejos No. 6 and Mogote Dams*," U.S. Bureau of Reclamation, January 5, 1940.

5

U.S. Bureau of Reclamation, Supplemental Report, Conejos Division, San Luis
Valley Project, Colorado*, April 30, 1947.

6

U.S. Bureau of Reclamation, Materials Laboratories Report No. C-398, "Laboratory Investigations of Concrete Aggregate and Riprap, Platoro Dam Site, San Luis Project," August 13, 1948.

7 U.S. Bureau of Reclamation, Earth Materials Laboratory No. EM-203, "Laboratory

Tests on Proposed Embankment Materials, Platoro Dam, San Luis Valley Project, Colorado, March 1, 1949.

11

8

U.S. Bureau of Reclamation, Zoning Report of Platoro Dam, San Luis Valley Project, Colorado, Conejos Division*, 1950.

9

U.S. Bureau of Reclamation, Report of Diversion of Conejos River, San Luis Valley Project, Colorado, Platoro Dam*, July 17, 1950.

10

U.S. Bureau of Reclamation, Project Histories, San Luis Valley Project, Colorado, Conejos Division, Platoro Dam*, 1948-51.

11

U.S. Bureau of Reclamation, Final Construction Report on Platoro Dam, San Luis
Valley Project, Colorado*, October 1, 1951.

12

U.S. Bureau of Reclamation, Final Embankment Construction Report for Platoro Dam, San Luis Valley Project, Colorado*, October 1, 1951.

*Unpublished
**Superscript numbers throughout the text refer to appropriate selected items in this

appendix. Reference items 13 through 25 are not listed in this copy. They are items of official correspondence.

[blocks in formation]
« PreviousContinue »