TABLE D_3.—Mefphis districtContinued [Bank protection works built during fiscal year and effective protection in place June 30, 1945]

* Squares = 10 feet x 10 feet (100 square feet).
* Work under construction (Mattress work complete).
. Linear feet, triangular frame dikes.

A=Asphalt: ACArticulated concrete; CB=Concrete blocks; FW=Frame willow; G=Groins, rock; L=Lumber mattress; R=Riprap: S=Slab Con.
erete: T=Tetrahedrons: W = Willow fascine mattress.

NOTE:--Discrepancies between effective revetment in place reported above and in previous reports due to replacements of old work having been reported as new revetment and caving of bars which previously masked the revetment.

[blocks in formation]

1 Excluding yardage to be abandoned.

1,326 square miles protected includes Red River, South Bank, West Atchafalaya River, and Bayou des Glaises. • Including Simmesport Ring levee 1.6 miles, Melville Ring levee 4.1 miles, and Ferriday Ring levee 9.3 miles * 23,700 cubic yards placed as provided for in sec. 6 of May 15, 1928 act.

[graphic]

TABLE E-2.-Vicksburg district (Present condition of project levees, from Cape Girardeau, Mo., to Head of Passes, La., and levee operations for fiscal year 1945, as provided for in sec. 1 of the act of May 15, 1928,

and amendments and modifications, including the act approved Aug. 18, 1941)

[blocks in formation]

1 Includes 0.8 mile concrete levee wall and 0.9 mile earth levee on Vicksburg City front. 2 Built to 1928 krade and section: includes 3.27 miles concrete levee wall, Monroe and West Monroe. • Not Available.

Included in 2,000 square milex, Upper Ten san, Missippi River.

TABLE E-3.—Memphis district (Present condition of project leveos, from Cape Girardeau, Mo., to Head of Passes, LA., and levee operations for fiscal year 1945, as provided for in sec. 1 of the act of May 15, 1928,

and amendments and modifications, including the act approved Aug. 18, 1941]

Operations fiscal year 1945

In sys

Location or levee district

672607-46—pt. 1, vol. 279

tem when completed

Built to
Built approved Contents
June 30, grade June 30,
1945

and 1944 section

Estimated

final contents 1

Required to complete

Lost or aban. doned

Percent complete June 30, 1945

Contents June 30,

1945

New work

Approximate

area protected

Maintenance

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

1 Excluding yardage to be abandoned.

* Includes 1.4 miles of Hickman City levee; and 21.3-miles of Mississippi River front line levee, Hickman, Ky., to Bessie, Tenn. Extended 0.1 mile since 1944
report.

3 Extends from Long Lake, Ark., to Laconia Back Circle levee.
• Includes 67 miles of front line levee from Helena to the mouth of White River, Ark., and 6.6 miles of Laconia Back Circle levee.
• Levee setback, 374 and 84, miscellaneous repairs.
• From New Madrid, Mo., to mouth of the St. Francis River, Ark.

7 Includes 84.3 miles of front line levee from Commerce to New Madrid, Mo.; 34.5 miles of Birds Point-New Madrid setback levee; and 14 miles of
New Madrid-Sikeston Ridge (St. John's Bayou) levee.

8 Includes 6.3 miles of Cairo drainage district (Mississippi River) levee and 3.4 miles of Cairo front (Mississippi River) levee.
Includes 15 miles Oak Donnick floodway levee.
10 Includes 14.1 miles of main line diversion levee; 2.7 miles of Ramsey Creek levee; 2.9 miles of Sals Creek levee.

11 Includes 5.3 miles of levee from Cache River to lower end of seawall at Cairo, Ill.; and 8.7 miles of Mounds and Mound City, Ill. levee now under jurisdiction of the Louisville, Ky., engineer district.

12 Includes 8.7 miles of Mounds and Mound City, Ill. levee now under jurisdiction of the Louisville, Ky., engineer district. 13 Connects Mississippi River and Ohio River levees. 14 Included in 11 square miles, Thebes to Cairo, Ill.