maintenance, when and as required, and hold the United States free from claims for damages resulting from construction work. These requirements have not been fulfilled.

Terminal facilities.-There is one wharf and several fish-receiving hoppers in Monterey Bay at Moss Landing. These facilities are not adequate. Local interests plan the construction of adequate facilities upon completion of the project harbor.

Operations and results during fiscal year.-None.

Condition at end of fiscal year. No work has been done on the project. The conditions are generally as described in the report carrying the recommended modification of the project. There have been no costs or expenditures.

Proposed operations.-An allotment of $350,000 made in July 1945 will be applied to new work, constructing the entire project by contract August to December 1945.

No work is contemplated for the fiscal year ending June 30, 1947.

[blocks in formation]

Location.-Noyo Harbor is a cove on the California coast about 135 miles northwest of San Francisco. Noyo River rises in the Coast Range Mountains, flows westerly, and empties into Noyo Harbor. (See U. S. Coast and Geodetic Survey Chart No. 5703.) Previous projects.-Adopted by the River and Harbor Act of September 22, 1922. For further details see page 1680, Annual Report for 1929, and page 1772, Annual Report for 1930.

Existing project. This provides for a rubblemound breakwater extending northwesterly about 1,100 feet from the south headland of Noyo Harbor, and for an entrance channel into Noyo River 10 feet deep and 100 feet wide and a channel in the river 10 feet deep and 150 feet wide extending to the highway bridge at Noyo, to be obtained by dredging and jetty construction. All depths refer to mean lower low water. The tidal range between mean lower low water and mean higher high water is 5.8 feet. The extreme range is about 11.5 feet.

The estimate of cost for new work, revised in 1945, is $784,000. The latest (1940) approved estimate for annual cost of maintenance is $27,500.

The existing project was authorized by the following river and harbor acts:

Acts

Work authorized

Documents

July 3, 1930 Entrance channel and channel in the river.
Mar. 2, 1945 The breakwater in Noyo Harbor..

S. Doc. No. 156, 71st Cong., 2d ses H. Doc. No. 682, 76th Cong., 3d = (Contains latest published ma?

Local cooperation.-The act of March 2, 1945 requires that loc interests provide the necessary rights of way and easements for the construction and maintenance of the breakwater, including access thereto, and a suitable royalty-free quarry in the locality: and give assurances satisfactory to the Secretary of War tha they will provide suitable public facilities and arrangements f the loading and unloading of vessels in Noyo Harbor. These re quirements have not been complied with. All prior requirement have been fully complied with.

Terminal facilities.-In the harbor, there are moorings and a cableway for holding and loading vessels. In the river there ar four wharves for unloading fish, three boat-fueling terminals, an one boat-repair plant. These facilities are adequate, but mooring facilities for fishing boats are inadequate and steps are being taken to enlarge them.

Operations and results during fiscal year.-The entrance charnel was redredged by contract, 6,764 cubic yards being remove. therefrom. A public hearing was held and a report rendered the adequacy of the highway bridge across the river just upstream from the head of the project. The cost was $9,844.59 for mairtenance. The expenditures were $9,800.91.

Condition at end of fiscal year. The project is about 23 perce complete. The work remaining to be done is the construction ef the breakwater in Noyo Harbor authorized by the act of Marc 2, 1945. At the end of the year the controlling depth in the river project was 5 feet in the entrance channel, thence 6 feet to th head of the project except that a small shoal, with 2 feet of depth existed on the north side of the channel about 100 feet downstream from the head of the project.

The cost of the existing project to the end of the fiscal year was $183,684.66 for new work and $142,968.90 for maintenance, & total of $326,653.56. The expenditures were $326,609.88.

Proposed operations.-The balance unexpended June 30, 1945, together with an allotment of $11,000 made in July 1945, amour: ing in all to $25,799.09, will be applied as follows:

Accounts payable June 30, 1945

New work: Advance planning and preparation of plans and specifications for the construction of the project breakwater by hired labor

$123 34

11,000.

Total

Maintenance: Redredging the project channel from near the entrance to the head of the project by contract March to May 1946

14,675 75

25,799.0

The additional sum of $10,000 can be profitably expended during the fiscal year 1947 for maintenance, by contract April and May 1947 removing shoals in the project channel caused by winter storms.

Cost and financial summary

Cost of new work to June 30, 1945
Cost of maintenance to June 30, 1945

Total cost of permanent work to June 30, 1945 Minus accounts payable June 30, 1945

Net total expenditures

Unexpended balance June 30, 1945

Total amount appropriated to June 30, 1945

1 $195, 669. 94 2175, 065. 45

370, 735. 39 43.68

370, 691. 71 14, 799. 09

385, 490.80

[blocks in formation]

Balance unexpended July 1, 1944

Amount allotted from War Department Civil Ap-
propriation Act approved June 26, 1944
Amount allotted from War Department Civil Ap-
propriation Act approved Mar. 31, 1945
Amount allotted from War Department Civil Ap-
priation Act approved June 11, 1938

Amount to be accounted for

Gross amount expended

Balance unexpended June 30, 1945

Outstanding liabilities June 30, 1945

Balance available June 30, 1945

$10,000.00

9, 500.00

5,000.00

$100.00

24, 500.00

24, 600.00 9, 800.91

14, 799. 09 123.34

14, 675. 75

Amount allotted in July 1945

11, 000. 00

Unobligated balance available for fiscal year 1946

25, 675. 75

Amount (estimated) required to be appropriated for completion of existing project'

589, 000. 00

Amount that can be profitably expended in fiscal year ending
June 30, 1947, for maintenance 3

10, 000. 00

1 Exclusive of $7,179.86 expended from contributed funds for new work.

2 Exclusive of $820.14 expended from contributed funds for maintenance.

* Exclusive of available funds.

10. HUMBOLDT HARBOR AND BAY, CALIF.

Location.-Humboldt Bay is a small landlocked harbor on the coast of California, 225 miles north of San Francisco Bay and 70 miles south of Crescent City Harbor. (See U. S. Coast and Geodetic Survey Chart No. 5832.)

Previous projects.-Adopted by the River and Harbor Acts of March 3, 1881, September 19, 1890, July 3, 1892, March 3, 1899,

and March 2, 1907. For further details see pages 1982-84 of! Annual Report for 1915, page 1673 of Annual Report for 1929, and page 1689 of Annual Report for 1938.

Existing project. This provides for two rubble-mound jettie at the entrance-the north jetty about 4,500 feet in length and the south jetty 5,100 feet long, not including shore revetments; for a entrance channel with suitable alinement 30 feet deep and 500 fer wide; for a channel 26 feet deep and 400 feet wide from deep wate in Humboldt Bay to the foot of N Street, Eureka; a channel 26 feet deep and 300 feet wide across Indian Island Shoal to Samoa a channel 18 feet deep and 150 feet wide to Arcata wharf; and a channel 26 feet deep and 300 feet wide to Fields Landing, with a turning basin 600 feet wide and 800 feet long off the Fields Landing wharf. All depths refer to mean lower low water. The tida range between mean lower low water and mean higher high water is 6.4 feet at the south jetty and 6.7 feet at Eureka. The extreme range is 12.5 feet at the south jetty and 12 feet at Eureka.

The estimate of cost for new work, revised in 1937, was $2793,000, of which $95,000 was contributed by local interests. This estimate is exclusive of the amounts expended on previous proects. The latest (1937) approved estimate for annual cost of mairtenance of dredging is $58,000. There is no approved estimate for maintenance of the jetties.

The existing project was authorized by the following river and harbor acts:

[blocks in formation]

Local cooperation.-Fully complied with.

Terminal facilities.-There are 36 wharves and 7 small-boat landings, exclusive of facilities owned by the United States. These facilities are considered adequate for existing commerce.

Operations and results during fiscal year.-Repairs to the sout jetty under way, with Government plant and hired labor, at the beginning of the year, were completed, 3,342 cubic yards of cocrete being placed, of which 2,442 cubic yards were mass concret and 900 cubic yards were in 100-ton blocks. The U. S. hoppe dredge Pacific removed 175,699 cubic yards of material from the Fields Landing channel and turning basin and the Samoa channel The jetties were patrolled during the winter to observe the effect of storms on the repairs. The cost was $90,931.12 for mainte nance. The expenditures were $97,066.56.

Condition at end of fiscal year.-The existing project was completed in 1939. The north jetty was completed in 1925, the south jetty in 1927, the Arcata channel in 1931, the Fields Landing channel and turning basin and the Eureka and Samoa channels in 1939. At the end of the year the controlling depths were as follows: Southwesterly entrance channel, 34 feet; channel between the jetties, 30 feet for a width of 450 feet; natural channel in the bay north of the entrance thereto, 24 feet; Samoa channel, 25 feet; Eureka channel, 23 feet to B Street, thence 17 feet to M Street, thence 12 feet to the head of the project; Fields Landing channel, 21 feet across a bar at its northerly end and in the turning basin, but 26 feet can be carried around the shoal areas and to the Fields Landing wharf. In May 1937, the controlling depth in the Arcata channel (which is now no longer used) was 18 feet. The cost of the existing project to the end of the fiscal year was $2,778,887.78 for new work and $4,477,900.94 for maintenace, a total of $7,256,788.72. The expenditures were $7,261,173.33. In addition, $95,000 was expended from contributed funds for new work.

Proposed operations.-The balance unexpended June 30, 1945, together with an anticipated allotment, will be applied as follows:

Accounts payable June 30, 1945

Maintenance:

Redredging the Fields Landing channel and turning basin
and the Samoa channel with Government hopper dredge
April to June 1946

Observation and inspection of north and south jetties by hired
labor during the winter November 1945 to April 1946
Periodic condition surveys by hired labor during the fiscal
year

Total

$172. 15

59, 319. 72

4,500.00

2,000.00

66,091.87

The additional sum of $55,000 can be profitably expended during the fiscal year 1947 for maintenance, redredging the project channels (except the Arcata channel) with Government hopper dredge March and April 1947. This work will be necessary to maintain adequate depths for existing traffic.

Cost and financial summary

1 $5, 040, 258. 71

4, 576, 106. 69

Cost of new work to June 30, 1945
Cost of maintenance to June 30, 1945

Total cost of permanent work to June 30, 1945

Undistributed costs June 30, 1945

Net total cost to June 30, 1945 Minus accounts payable June 30, 1945

Net total expenditures

Unexpended balance June 30, 1945

Total amount appropriated to June 30, 1945

9, 616, 365. 40 4, 532.86 9, 620, 898. 26 148.25

9, 620, 750. 01 4, 091.87

9, 624, 841. 88