plans was initiated by hired labor at a total cost during the fiscal year of $10,883.33.

Liberty Bend Cut-off unit.-Work in connection with project plans was accomplished by hired labor at a cost of $5,289.80, and incidental costs in the amount of $137.84 were incurred in connection with the initiation of work on preparation of detailed plans, amounting to a total cost for the fiscal year of $5,427.64.

The total cost during the fiscal year for this project, all new work, including incidental costs of $155.97 for work on project plans for the channel and floodway improvement, Missouri River units and channel improvement, Kansas River unit, was $357 687.43; and the total expenditures were $44 119.43.

Condition at end of fiscal year.-The existing project is about 18 percent complete at the end of the fiscal year. Except for the completion of pumping plants Nos. 3 and 5, raising of the levees in the Fairfax-Jersey Creek unit, and the removal of obstructions in the Channel Improvement, Kansas River unit, these two units were completed at the end of the fiscal year 1942. Completed work included the construction of 30,900 linear feet of earth levees, a levee drainage system, approximately 14,974 squares of foundation and toe-protection mattress, 30,881 squares of revetment paving, 965 linear feet of steel sheet-pile wall, 11 sewer outlets, 1.981 linear feet of flood walls and 5 flood sills, and completion of pumping plant No. 1 and substructures only for pumping plants Nos. 3 and 5, in connection with the Fairfax-Jersey Creek unit; the excavation and disposition of 361,013 cubic yards of material in connection with the removal of the foreshore bar, removal of 14 255 cubic yards of objectionable material, and placement of 34,047 cubic yards of earth fill, 25,426 tons of stone, and 4,149 squares of bank paving in connection with bank stabilization under the channel improvement, Kansas River unit. The James Street Bridge (bridge and approach alterations, Kansas River unit) has been raised to the required elevation.

The total cost (exclusive of $70,689.96 contributed funds and -$8,550.94 undistributed cost) of the existing project, all new work, at the end of the fiscal year was $3,370,472.83 and the total expenditures were $3,334,002.28 (exclusive of $70,689.96 contributed funds).

Proposed operations.-The unexpended balance of $128 097.72, minus undistributed costs of $8,550.94, plus accounts receivable at the end of the fiscal year of $413.93, will be applied during the fiscal year ending June 30, 1946, as follows:

[blocks in formation]

By contract:

Furnishing mechanical and electrical

equipment for pumping plants $15, 075. 00 Completion of construction of pumping

plants

By hired labor:

Engineering and design____

Raising Fairfax levee: Design and
preparation of project and detailed
plans

48, 225.00

1, 907. 17

30, 305. 00

$28, 333. 54

[blocks in formation]

By contract: Expert Engineering services. 24, 840. 00
By hired labor: Design and preparation of
project and detailed plans

North Kansas City Unit:

By contract: Outstanding costs for Archi-
tect-Engineer services

By hired labor: Design and preparation of
project and detailed plans for pumping
plants

[blocks in formation]

18,850.00

210.00

23, 815.00

33, 250.00

955.00

4,395.00

21, 620. 00

25,000. 00

Liberty Bend Cut-off unit:

Proposed contract: Expert engineering
services

35,000.00

20, 040. 00

Total new work

$391, 627.17

419, 960. 71

By hired labor: Design and preparation of
project and detailed plans.

Total for all work----

The additional sum of $5,000,000 can be profitably expended during the fiscal years 1946 and 1947, ($2,000,000 of this total in 1946) as follows:

New work (July 1, 1946, to June 30, 1947):

Fairfax-Jersey Creek unit:

Proposed contract: Protection in vicinity of Jersey Creek $500,000 Armourdale unit:

[blocks in formation]

Argentine unit:

- Proposed contract: Treating of most critical portion of
sand boil area_

North Kansas City unit:

Proposed contract:

Completion of works from upstream end to Hannibal Bridge fill...

East Bottoms unit:

Proposed contract: Completion of works from upstream
end to old Chicago, Milwaukee, St. Paul and Pacific
Railroad bridge fill..

Total

$25,000

1, 000, 000

1, 000, 000

5, 000, 000

Cost and financial summary

1

Cost of new work to June 30, 1945.
Cost of maintenance to June 30, 1945_

Total cost of permanent work to June 30, 1945.

Undistributed costs June 30, 1945--

[blocks in formation]

1 $3, 441, 162. 79

[blocks in formation]

Fiscal year ending June 30

[blocks in formation]

Amount (estimated) required to be appropriated for completion of existing project 2..

Amount that can be profitably expended in fiscal years 1946 and 1947 for new work 2.

2 Exclusive of available funds.

14. TOPEKA, KANSAS RIVER, KANS.

$14, 682; 900.00

5, 000, 000.00

Location. This project is located on the right and left hanks of the Kansas River at Topeka, Kans.

Existing project. The plan of improvement provides for the raising and extending of existing levees and the construction of new levees and flood walls, consisting of the following features: 7.200 feet of earth levee, 2,016 feet of concrete flood wall. and 6.350 feet of bank-protection works, along the right bank of the Kansas River, extending from the Chicago, Rock Island & Pacific Railroad bridge over Ward Creek to high ground upstream from the Atchison, Topeka & Santa Fe Railroad bridge; 1,662 feet of flocd wall and 943 feet of levee around the municipal waterworks; about 5.120 feet of bank-protection works along the left bank of the Kansas River; 23,175 feet of levee and 700 feet of flood walls around North Topeka; and numerous appurtenant features. The project when completed will provide protection to North Topeka, South Topeka (between Ward Creek and the Atchison, Topeka & Santa Fe Railroad shops). and the municipal waterworks, against a flood equivalent to that of 1903. The existing project was authorized by the Flood Control Act approved June 22, 1936 (H. Dcc. No. 195, 73d Cong., 2d sess.). The estimated cost of construction, revised in 1940. is $1,056,000. and the estimated cost of lands and damages, $93.600.

Local cooperation.-See page 5 for requirements. The conditions of local cooperation have been fully complied with except for the North Topeka unit. Local interests have furnished assur- i ance that the litigation which has been pending relative to the North Topeka unit can he settled. The city of Topeka has contributed to the United States a net sum of $7.659.31 to defray the cost of incidental features of construction at the city waterworks, desired by the city but not required for adequate flood protection.

Operations and results during fiscal year.-None.

Condition at end of fiscal year.-The existing project was ap rroximately 69 percent complete at the end of the fiscal year. The work accomplished consists of the removal of objectionable. material and placing of 174 569 cubic yards of earth fill in an earth levee; construction of 2,016 linear feet of concrete flood wall 6421.4 linear feet of hank paving. 2 600 linear feet of waterworks protection, three protection enclosures at the waterworks, one floodgate, nine sewer-outlet extensions, and appurte nant features; and seeding of levees.

The work remaining to be done to complete the existing project consists of the construction of the North Topeka unit. Commencement of this work was postponed indefinitely in February 1940 after a suit was brought against the city of Topeka and others to enjoin construction of the North Topeka flood-protection works.

Local interests have furnished assurance that the litigation will be settled in the near future and have requested that necessary work be accomplished to place the plans in readiness for initiation upon a return to normal conditions.

The total cost and expenditures (exclusive of $7,659.31 of contributed funds but inclusive of $8,208.62 undistributed costs) of the existing project (all new work) at the end of the fiscal year were $738,169.82 ($472,169.82 from regular funds and $266,000 from Emergency Relief funds).

Proposed operations.-The unexpended balance of $1,830.18 at the end of the fiscal year will be applied to the cost of reviewing the plans for completion of construction of this project.

No additional funds can be profitably expended during fiscal year 1947.

Cost and financial summary

Cost of new work to June 30, 1945.
Cost of maintenance to June 30, 1945_-.

Total cost of permanent work to June 30, 1945

Undistributed costs June 30, 1945.

[blocks in formation]
[blocks in formation]

Total amount appropriated to June 30, 1945_--

Fiscal year ending June 30

1941

1942

1943

[blocks in formation]
[blocks in formation]

Amount (estimated) required to be appropriated for completion of existing project 2

: Includes $7,659.31 contributed funds.

* Exclusive of available funds.

$1,830. 18 1,830. 18

316, 000.00

15. TUTTLE CREEK RESERVOIR, MISSOURI RIVER BASIN, KANS.

Location. The proposed dam site for the Tuttle Creek Reservoir is located on the main stem of the Big Blue River, approximately 12 miles above the mouth of the stream in Riley and Pottawatomie Counties, Kans. The site is about 12 miles northwest of Manhattan, Kans.

Existing project.—A preliminary plan of this project provides for a dam approximately 5,500 feet long and about 155 feet high above the stream bed. This project is one unit of the general comprehensive plan for flood control and other purposes in the Missouri River Basin authorized by the Flood Control Act approved June 28, 1938 (Flood Control Committee Document No. 1,