Port SeriesU.S. Government Printing Office, 1979 - Harbors |
From inside the book
Results 1-5 of 37
Page 77
... Floor Area for Cargo ( Sq . Ft . ) Load Capacity ( Lbs . per Sq . Ft . ) Cargo Doors MECHANICAL HANDLING FACILITIES RAILWAY CONNECTIONS HIGHWAY CONNECTIONS None . Sides 23 + 20 , each . 2,350 36-45 2,300 2,300 Open . 16 Face 1,400 ...
... Floor Area for Cargo ( Sq . Ft . ) Load Capacity ( Lbs . per Sq . Ft . ) Cargo Doors MECHANICAL HANDLING FACILITIES RAILWAY CONNECTIONS HIGHWAY CONNECTIONS None . Sides 23 + 20 , each . 2,350 36-45 2,300 2,300 Open . 16 Face 1,400 ...
Page 78
... floor . Number and Description Length and Width ( Feet ) 600 by 200 Height Inside ( Feet ) 19 Floor Area for Cargo ( Sq . Ft . ) Load Capacity ( Lbs . per Sq . Ft . ) 72,000 1,400 Face Sides 16 135 , each . 35 35 270 135 135 16 16 ...
... floor . Number and Description Length and Width ( Feet ) 600 by 200 Height Inside ( Feet ) 19 Floor Area for Cargo ( Sq . Ft . ) Load Capacity ( Lbs . per Sq . Ft . ) 72,000 1,400 Face Sides 16 135 , each . 35 35 270 135 135 16 16 ...
Page 82
... floor . Lighted . One - steel frame , clear span , concrete and metal walls with asphalt - surfaced floor . Lighted . None . Length and Width ( Feet ) 970 by 200 Height Inside ( Feet ) 22 to 35 Floor Area for Cargo ( Sq . Ft . ) Load ...
... floor . Lighted . One - steel frame , clear span , concrete and metal walls with asphalt - surfaced floor . Lighted . None . Length and Width ( Feet ) 970 by 200 Height Inside ( Feet ) 22 to 35 Floor Area for Cargo ( Sq . Ft . ) Load ...
Page 85
... Floor Area for Cargo Load Capacity ( Lbs . per Sq . Ft . ) Cargo Doors MECHANICAL HANDLING FACILITIES RAILWAY CONNECTIONS HIGHWAY CONNECTIONS WATER SUPPLY ELECTRIC CURRENT FIRE PROTECTION ( Other than City ) REMARKS ( Feet ) 1,994 ...
... Floor Area for Cargo Load Capacity ( Lbs . per Sq . Ft . ) Cargo Doors MECHANICAL HANDLING FACILITIES RAILWAY CONNECTIONS HIGHWAY CONNECTIONS WATER SUPPLY ELECTRIC CURRENT FIRE PROTECTION ( Other than City ) REMARKS ( Feet ) 1,994 ...
Page 89
... floor . One steel frame , clear span , concrete walls , with asphalt - surfaced floor . None . · Berth 34 Length and Width ( Feet ) 608 by 120 Height Inside ( Feet ) 20-27 Floor Area for Cargo ( Sq . Ft . ) 66,700 , gross . Load ...
... floor . One steel frame , clear span , concrete walls , with asphalt - surfaced floor . None . · Berth 34 Length and Width ( Feet ) 608 by 120 Height Inside ( Feet ) 20-27 Floor Area for Cargo ( Sq . Ft . ) 66,700 , gross . Load ...
Other editions - View all
Common terms and phrases
2-inch line 40 feet wide Alongside at MLLW American President Lines anchorage Apron Feet asphalt Berthing Space Feet Breasting Distance Feet City of Long Concrete pile CONNECTIONS WATER SUPPLY containerized CORPS OF ENGRS CURRENT FIRE PROTECTION Deck at MLLW Depth Alongside Dock Code ELECTRIC CURRENT FIRE ENGRS WATERWAY CODE equipment Fireboat floats floor Forklift trucks fronted by timber gantry cranes hand extinguishers Harbor Department Height of Deck HIGHWAY CONNECTIONS WATER hose connections Hydrants Inner Harbor Larson Boat Lighted or Unlighted Load Capacity Lbs located at rear LOCATION ON WATERFRONT Long Beach Freeway MECHANICAL HANDLING FACILITIES MLLW Feet Mooring NUMBER ON MAP OPERATED BY PURPOSE Port Hueneme Receipt and shipment San Pedro San Pedro Bay security patrol Space Cu.Ft SUPPLY ELECTRIC CURRENT Terminal Island thence timber fender system timber floats Total Berthing Space transit shed TYPE OF CONSTRUCTION volts WATER SUPPLY ELECTRIC WATERWAY CODE LATITUDE Width of Apron Wilmington
Popular passages
Page 23 - Port is not necessary for plant engaged upon works of river and harbor improvement under the supervision of the District Engineer, but the District Engineer will notify the Captain of the Port in advance of all such proposed work.
Page 7 - Provide without cost to the United States all lands, easements and rightsof-way required for construction and subsequent maintenance of the project and for aids to navigation upon the request of the Chief of Engineers, including suitable areas determined by the Chief of Engineers to be required in the general public interest for initial and subsequent disposal of spoil, and also necessary retaining dikes, bulkheads and embankments therefor or the costs of such retaining works.
Page vi - that the policy of the United States shall be to coordinate and plan the increasing use of the metric system in the United States and to establish a United States Metric Board to coordinate the voluntary conversion to the metric system".
Page 8 - States free from damages due to construction and maintenance; provide and maintain adequate public terminal and transfer facilities open to all on equal terms ; and provide and maintain without cost to the United States depths in berthing areas and local access channels serving the terminals commensurate with the depths provided in the related project areas.
Page 26 - Every power-driven vessel of 300 gross tons and upward while navigating; (2) Every vessel of 100 gross tons and upward carrying one or more passengers for hire while navigating; (3) Every towing vessel of 26 feet or over in length while navigating; and (4) Every dredge and floating plant engaged in or near a channel or fairway in operations likely to restrict or affect navigation of other vessels...
Page 7 - Hold and save the United States free from damages that may result from the construction and maintenance of the project.
Page 9 - The range between mean lower low water and mean higher high water or, in places having only one tide daily, the range between mean low water and mean high water.
Page 7 - States free from damages that may result from construction and maintenance of the project; (3) provide and maintain at local expense adequate public terminal and transfer facilities open to all on equal terms; and...
Page 174 - Galveston also has a number of plants without waterfront facilities which are engaged in various types of marine repair work. These companies maintain shops and portable equipment for making above-waterline repairs, and for installing equipment, gear, and machinery on all types of craft at berth. In addition, there are...
Page 15 - ... shall predominate. (II) Bunkering and lightering operations are prohibited in this anchorage. (III) Vessels 30 meters or over in length, towing vessels of 8 meters or over in length engaged in towing, every vessel of 100 gross tons and upward carrying one or more passengers of hire while navigating, and each dredge and floating plant engaged In operations shall not enter anchorage G unless: (A) In an emergency; (B) Proceeding to anchor In or departing from Commercial Anchorage G; (C) Standing...