United States Congressional Serial Set, Issue 10882U.S. Government Printing Office, 1944 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-5 of 100
Page 11
... tion 1. Original design flood ( " 308 " plan ) : Spillway discharge at maxi- mum pool elevation . cubic feet per second .. 20,000 11,300 25,000 Required spillway capacity at cubic feet per second .. do . maximum pool elevation cubic ...
... tion 1. Original design flood ( " 308 " plan ) : Spillway discharge at maxi- mum pool elevation . cubic feet per second .. 20,000 11,300 25,000 Required spillway capacity at cubic feet per second .. do . maximum pool elevation cubic ...
Page 14
... from 100 feet to 230 feet by extension to the northeast . The eleva- tion of the spillway crest would be increased from 1,165 feet to 1,167 feet , mean sea level , in order to obtain 14 WINOOSKI RIVER AND TRIBUTARIES , VERMONT.
... from 100 feet to 230 feet by extension to the northeast . The eleva- tion of the spillway crest would be increased from 1,165 feet to 1,167 feet , mean sea level , in order to obtain 14 WINOOSKI RIVER AND TRIBUTARIES , VERMONT.
Page 15
... tion of the spillway channel . Concrete retaining walls would be constructed along both sides of the spillway and spillway channel . A stilling basin , 100 feet in length , would be provided at the lower end of the spillway channel to ...
... tion of the spillway channel . Concrete retaining walls would be constructed along both sides of the spillway and spillway channel . A stilling basin , 100 feet in length , would be provided at the lower end of the spillway channel to ...
Page 2
... tion of the project at an early date ; and that the Hungry Horse project , scheduled for completion in 1946 , is included in the program for new generating facilities to meet anticipated defense power loads , as recommended to the ...
... tion of the project at an early date ; and that the Hungry Horse project , scheduled for completion in 1946 , is included in the program for new generating facilities to meet anticipated defense power loads , as recommended to the ...
Page 4
... , including the stabiliza- tion of the level of Lake Pend Oreille , Idaho . ( c ) Act of August 28 , 1937 ( Public Law No. 406 , 75th Cong . , H. R. 7646 ) : * * SEC . 5. That section 6 of the 4 HUNGRY HORSE DAM , MONT .
... , including the stabiliza- tion of the level of Lake Pend Oreille , Idaho . ( c ) Act of August 28 , 1937 ( Public Law No. 406 , 75th Cong . , H. R. 7646 ) : * * SEC . 5. That section 6 of the 4 HUNGRY HORSE DAM , MONT .
Contents
5 | |
15 | |
22 | |
29 | |
51 | |
14 | |
4 | |
7 | |
11 | |
26 | |
44 | |
50 | |
56 | |
v | |
vii | |
1 | |
2 | |
10 | |
37 | |
38 | |
47 | |
49 | |
50 | |
52 | |
53 | |
54 | |
55 | |
56 | |
59 | |
61 | |
64 | |
68 | |
70 | |
72 | |
74 | |
75 | |
76 | |
77 | |
78 | |
81 | |
82 | |
84 | |
85 | |
i | |
iv | |
v | |
ix | |
4 | |
5 | |
6 | |
7 | |
1 | |
5 | |
15 | |
21 | |
22 | |
26 | |
27 | |
33 | |
47 | |
60 | |
67 | |
73 | |
80 | |
86 | |
94 | |
108 | |
4 | |
9 | |
11 | |
15 | |
22 | |
30 | |
40 | |
48 | |
51 | |
57 | |
60 | |
63 | |
5 | |
7 | |
1 | |
6 | |
18 | |
19 | |
22 | |
23 | |
24 | |
25 | |
31 | |
3 | |
4 | |
16 | |
1 | |
10 | |
13 | |
17 | |
26 | |
27 | |
28 | |
1 | |
21 | |
11 | |
Other editions - View all
Common terms and phrases
acre-feet acres additional Albright annual benefits annual charges Ariz average annual Beaver Hole Big Sandy Buggs Island capacity Cheat River Basin Cheat River system Chief of Engineers comprehensive plan construction cost Creek cubic feet discharge district engineer division engineer downstream drainage area elevation Engineers for Rivers Erwin estimated existing facilities Federal Power Commission feet per second flood damage flow Glady Fork hydroelectric improvements inches industrial installation irrigation kilowatt-hours kilowatts Lake Lynn plant lands levees Little Colorado River load factor located maximum ment Middle Cheat Monongahela River navigation Number Ohio River operation Ouachita River peak percent Philpott Pittsburgh pollution abatement power development proposed River and tributaries River Valley Rivers and Harbors Roanoke River Roanoke River Basin Rowlesburg run-off Sacramento River second-feet Shavers Fork Smith River spillway square miles storage reservoirs stream survey tion Total transmission United upper Ohio River utilized water power water-power development watershed West Virginia Youghiogheny River
Popular passages
Page 18 - Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 4 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 7 - That the following works of improvement of rivers, harbors,and other waterways are hereby adopted and authorized, to be prosecuted under the direction of the Secretary of War and supervision of the Chief of Engineers...
Page 15 - That the Board of Engineers for Rivers and Harbors, created under Section 3 of the River and Harbor Act approved June 13, 1902, be, and is hereby requested to review the...
Page 19 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 12 - That hereafter no money appropriated under authority of this Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War...
Page 3 - Resolved by the Committee on Rivers and Harbors of the House of Representatives, United States, That the Board of Engineers for Rivers and Harbors created under section 3 of the River and Harbor Act, approved June 13...
Page 2 - The general comprehensive plan for flood control and other purposes in the Arkansas River Basin, as set forth in Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as in the discretion of the Secretary of War, and the Chief of Engineers may be advisable...
Page 24 - States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of War.
Page 2 - War. 3. After due consideration of these reports, I concur in the views and recommendations of the Board.