United States Congressional Serial Set, Issue 10882U.S. Government Printing Office, 1944 - United States Reports, Documents, and Journals of the U.S. Senate and House of Representatives. |
From inside the book
Results 1-5 of 100
Page 2
... additional capacity of 56,000 kilowatts when needed and that The Montana Power Co. may purchase power from the Washington Water Power Co. , which , in turn , can obtain power from the Grand Coulee development . On the basis of ...
... additional capacity of 56,000 kilowatts when needed and that The Montana Power Co. may purchase power from the Washington Water Power Co. , which , in turn , can obtain power from the Grand Coulee development . On the basis of ...
Page 3
... additional information to the Board . At their request a hearing was held at which they called attention to the changed conditions since the date of the division engineer's report and to the increasing need for power to carry out the ...
... additional information to the Board . At their request a hearing was held at which they called attention to the changed conditions since the date of the division engineer's report and to the increasing need for power to carry out the ...
Page 21
... additional installation of 77,000 horsepower and 56,000 kilowatts will be made when needed . Some work has been done on the second 28 - foot tunnel and the foundation for the additional generator and turbine has been built to above ...
... additional installation of 77,000 horsepower and 56,000 kilowatts will be made when needed . Some work has been done on the second 28 - foot tunnel and the foundation for the additional generator and turbine has been built to above ...
Page 25
... additional power would be necessary ; but the Federal Power Commission reports ( see par . 88 ) that under such a condi- tion facilities are now available , or could readily be installed in existing plants , to supply the increased ...
... additional power would be necessary ; but the Federal Power Commission reports ( see par . 88 ) that under such a condi- tion facilities are now available , or could readily be installed in existing plants , to supply the increased ...
Page 29
... additional 56,000 kilowatts of capacity can be installed at the Kerr plant at such time as the need for additional power arises . It is obvious , therefore , that the development of the Hungry Horse site will not be warranted for many ...
... additional 56,000 kilowatts of capacity can be installed at the Kerr plant at such time as the need for additional power arises . It is obvious , therefore , that the development of the Hungry Horse site will not be warranted for many ...
Contents
5 | |
15 | |
22 | |
29 | |
51 | |
14 | |
4 | |
7 | |
11 | |
26 | |
44 | |
50 | |
56 | |
v | |
vii | |
1 | |
2 | |
10 | |
37 | |
38 | |
47 | |
49 | |
50 | |
52 | |
53 | |
54 | |
55 | |
56 | |
59 | |
61 | |
64 | |
68 | |
70 | |
72 | |
74 | |
75 | |
76 | |
77 | |
78 | |
81 | |
82 | |
84 | |
85 | |
i | |
iv | |
v | |
ix | |
4 | |
5 | |
6 | |
7 | |
1 | |
5 | |
15 | |
21 | |
22 | |
26 | |
27 | |
33 | |
47 | |
60 | |
67 | |
73 | |
80 | |
86 | |
94 | |
108 | |
4 | |
9 | |
11 | |
15 | |
22 | |
30 | |
40 | |
48 | |
51 | |
57 | |
60 | |
63 | |
5 | |
7 | |
1 | |
6 | |
18 | |
19 | |
22 | |
23 | |
24 | |
25 | |
31 | |
3 | |
4 | |
16 | |
1 | |
10 | |
13 | |
17 | |
26 | |
27 | |
28 | |
1 | |
21 | |
11 | |
Other editions - View all
Common terms and phrases
acre-feet acres additional Albright annual benefits annual charges Ariz average annual Beaver Hole Big Sandy Buggs Island capacity Cheat River Basin Cheat River system Chief of Engineers comprehensive plan construction cost Creek cubic feet discharge district engineer division engineer downstream drainage area elevation Engineers for Rivers Erwin estimated existing facilities Federal Power Commission feet per second flood damage flow Glady Fork hydroelectric improvements inches industrial installation irrigation kilowatt-hours kilowatts Lake Lynn plant lands levees Little Colorado River load factor located maximum ment Middle Cheat Monongahela River navigation Number Ohio River operation Ouachita River peak percent Philpott Pittsburgh pollution abatement power development proposed River and tributaries River Valley Rivers and Harbors Roanoke River Roanoke River Basin Rowlesburg run-off Sacramento River second-feet Shavers Fork Smith River spillway square miles storage reservoirs stream survey tion Total transmission United upper Ohio River utilized water power water-power development watershed West Virginia Youghiogheny River
Popular passages
Page 18 - Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Page 4 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Page 7 - That the following works of improvement of rivers, harbors,and other waterways are hereby adopted and authorized, to be prosecuted under the direction of the Secretary of War and supervision of the Chief of Engineers...
Page 15 - That the Board of Engineers for Rivers and Harbors, created under Section 3 of the River and Harbor Act approved June 13, 1902, be, and is hereby requested to review the...
Page 19 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Page 12 - That hereafter no money appropriated under authority of this Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War...
Page 3 - Resolved by the Committee on Rivers and Harbors of the House of Representatives, United States, That the Board of Engineers for Rivers and Harbors created under section 3 of the River and Harbor Act, approved June 13...
Page 2 - The general comprehensive plan for flood control and other purposes in the Arkansas River Basin, as set forth in Flood Control Committee Document No. 1, Seventy-fifth Congress, first session, with such modifications thereof as in the discretion of the Secretary of War, and the Chief of Engineers may be advisable...
Page 24 - States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation, including the control of the level of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of War.
Page 2 - War. 3. After due consideration of these reports, I concur in the views and recommendations of the Board.